Removing cuttings from deviated and horizontal wells
Authors:
About authors
- Petroleum-Gas Universit of Ploiesti
Abstract
Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.
Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Funding:
None
Similar articles
Analysis of oil sludge using amperometric ion-selective electrodes
2008 K. O. Kunakov, M. V. Kryuchkov
Integrated monitoring of the impact of Severonickel Combine on the natural environment
2008 M. V. Parshina, D. S. Korelskii
Development of the automated system of maintenance of pumping modes of oil pumping stations, providing energy resources saving, on the basis of wireless technologies
2008 V. A. Baturin
Estimation of stability of the cavern for gas storage taking into account salt rheology
2008 D. V. Shustov