Removing cuttings from deviated and horizontal wells
Authors:
About authors
- Petroleum-Gas Universit of Ploiesti
Abstract
Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.
Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Funding:
None
Similar articles
Causes of oil deposits zonality formation in carbonate reservoirs on the example of oil deposits in the south-east of the Republic of Tatarstan
2008 A. N. Kolchugin
Solution of problems of water flooding of high-viscosity oil deposits in carbonate reservoirs
2008 V. V. Mukhametshin
Stimulation of investment attractiveness of environmental impact by methods of tax regulation
2008 T. A. Shelyakina