Removing cuttings from deviated and horizontal wells
Authors:
About authors
- Petroleum-Gas Universit of Ploiesti
Abstract
Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.
Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Similar articles
Development and bench testing of sealing of high speed roller cone bits supports
2008 S. Yu. Baigareev
Analysis of oil sludge using amperometric ion-selective electrodes
2008 K. O. Kunakov, M. V. Kryuchkov