Removing cuttings from deviated and horizontal wells
Authors:
About authors
- Petroleum-Gas Universit of Ploiesti
Abstract
Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.
Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Similar articles
Application of risk assessment concept in Estonian mining industry
2008 Sergei Sabanov, Jyri-Rivaldo Pastarus, Oleg Nikitin
Determination of hafnium in zirconium compounds using flame atomic absorption spectrometry (FAAS)
2008 Agata Jakóbik – Kolon, Marek Smolik, Ewa Miodek