Submit an Article
Become a reviewer
Vol 174
Pages:
40-41
Download volume:
RUS
Article

Removing cuttings from deviated and horizontal wells

Authors:
Sandoiu Gheorghe-Florin
About authors
  • Petroleum-Gas Universit of Ploiesti
Date submitted:
2007-07-04
Date accepted:
2007-09-11
Date published:
2008-03-17

Abstract

Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.

Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Funding:

None

Go to volume 174

Similar articles

Development and bench testing of sealing of high speed roller cone bits supports
2008 S. Yu. Baigareev
Development of device structure for detection of metal objects in ore
2008 A. M. Kurchukov
Prevention of corrosion and salt deposition by inhibiting foam systems in wells of North-West Bashkortostan fields
2008 B. R. Gilmutdinov
Application of risk assessment concept in Estonian mining industry
2008 Sergei Sabanov, Jyri-Rivaldo Pastarus, Oleg Nikitin
Development of the traction electric drive of the trolley transportation for the open-cast mining works
2008 V. A. Cherepanov
PB- and SR-isotopes – indicators for mixing processes in mine waters of the «Himmelfahrt Fundgrube»
2008 Heidel Claudia