Removing cuttings from deviated and horizontal wells
Authors:
About authors
- Petroleum-Gas Universit of Ploiesti
Abstract
Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.
Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Funding:
None
Similar articles
Prevention of corrosion and salt deposition by inhibiting foam systems in wells of North-West Bashkortostan fields
2008 B. R. Gilmutdinov
Waterproofing compound for limiting water inflow into producing oil wells
2008 I. N. Diyarov, N. Yu. Bashkirtseva, R. R. Agliullin