Removing cuttings from deviated and horizontal wells
Authors:
About authors
- Petroleum-Gas Universit of Ploiesti
Abstract
Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.
Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Funding:
None
Similar articles
Research of dependence of viscosity of electrolyte viscosity of electrolyte of copper refining production on its composition and temperature
2008 I. S. Kuzmina
Development of the automated system of maintenance of pumping modes of oil pumping stations, providing energy resources saving, on the basis of wireless technologies
2008 V. A. Baturin
Biodegradation of PAHs, PCBs and PHC in sediments from the manmade water course of Černý příkop in the municipal territory of the Ostrava city (Czech republic)
2008 Gabriela Lyčková, Radmila Kučerová, Peter Fečko, Iva Pečtová