Submit an Article
Become a reviewer
Vol 174
Pages:
40-41
Download volume:
RUS
Article

Removing cuttings from deviated and horizontal wells

Authors:
Sandoiu Gheorghe-Florin
About authors
  • Petroleum-Gas Universit of Ploiesti
Date submitted:
2007-07-04
Date accepted:
2007-09-11
Date published:
2008-03-17

Abstract

Effective cuttings transport is critical in drilling production horizontal and extended reach wells. In these cases, failure to remove drill cuttings from the hole would lead to deposition and accumulation of cuttings in the annulus, resulting in stuck pipe, eccentric annulus and/or reduced penetration rate.

Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Go to volume 174

Similar articles

Solution of problems of water flooding of high-viscosity oil deposits in carbonate reservoirs
2008 V. V. Mukhametshin
Investigation of the possibilities of water-gas influence on the reservoir using pump-ejector units
2008 D. I. Popov
Application of risk assessment concept in Estonian mining industry
2008 Sergei Sabanov, Jyri-Rivaldo Pastarus, Oleg Nikitin
Assessment of financial stability of LLC Peterburgteploenergo
2008 I. I. Kashtanova
Waterproofing compound for limiting water inflow into producing oil wells
2008 I. N. Diyarov, N. Yu. Bashkirtseva, R. R. Agliullin
Determination of hafnium in zirconium compounds using flame atomic absorption spectrometry (FAAS)
2008 Agata Jakóbik – Kolon, Marek Smolik, Ewa Miodek