Automatic sectionalization in electrical networks with voltage 6-10 kV
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
Problems of increase reliability electro-supply distributive networks of an average voltage at the mountain enterprises are considered. It is shown, that introduction decentralized with application of automatic points of sectioning considerably reduces systems consumption the electric power. Algorithms decentralized managements of emergency operation work of a network are resulted.
Область исследования:
(Archived) Electric drive, power supply, automation and control of mining and oil and gas production
Funding:
None
Similar articles
Elimination of complications and accidents during deep well drilling in glaciers
2008 N. I. Vasiliev, P. G. Talalay, V. M. Zubkov, A. V. Krasilev, M. V. Zubkov
Complex system of quality control of electric energy at the enterprises on mining and processing of minerals
2008 B. N. Abramovich
The area of existence of involute gear mesh with a given overlap coefficient
2008 A. S. Fokin, A. A. Poddubnaya, S. L. Ivanov, E. A. Kremcheev
Reduction of influence of higher harmonics on work of electrical complex of mining enterprise
2008 Ya. E. Shklyarskiy, D. A. Sitnikov, A. N. Skam'in