Submit an Article
Become a reviewer
Vol 178
Pages:
110-115
Download volume:
RUS
Article

Complex system of quality control of electric energy at the enterprises on mining and processing of minerals

Authors:
B. N. Abramovich
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-11-02
Date accepted:
2008-01-04
Date published:
2008-11-18

Abstract

Power quality level (PQ) is an important factor for providing of continuity and efficiency for technological process extraction, processing, and transportation of mineral resources. The electrical power cost decreasing method by means of actual power quality factors (PQF) putting in accordance with GOST 13109-97 norms has been proved. The PQF continuous complex monitoring system structure and its basic designing principles, which allows to make commercial, technical and technological PQ control, have been offered and economically sounded.

Область исследования:
(Archived) Electric drive, power supply, automation and control of mining and oil and gas production
Go to volume 178

Similar articles

Rheological model of the flow of a high-concentration hydro-mixture
2008 A. K. Nikolaev, S. Yu. Avksentiev
Relevance of application of centralized protection with inverse dependent time-current characteristic of RXIDG type for networks with resistive neutral groundi
2008 M. A. Bychin
Mobile complex for cleaning bottomhole zones of wells
2008 V. A. Solov'ev, E. A. Zagrivnyi
Method of integrity control of pipeline hydraulic transportation systems
2008 R. M. Proskuryakov, V. I. Malarev, N. V. Knyshov
Development and research of the arrangement of the executive body of the tunneling complex for the mines of OJSC Metrostroy
2008 D. A. Jungmeister, S. A. Ignatiev, A. Ya. Burak, S. A. Konovalov
Well damper
2008 Yu. D. Muraev, M. I. Kuzmin