Submit an Article
Become a reviewer
Vol 178
Pages:
82-85
Download volume:
RUS
Article

Analysis of calculation methods of technogenic risk at operation of main gas pipelines

Authors:
I. Yu. Podavalov
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-11-19
Date accepted:
2008-01-17
Date published:
2008-11-18

Abstract

Analysis methods of estimation industrial risk by operation gas-main pipeline is diacribed in thia article. Fundamental ideas and principal as well dignitys and drawbacks of existing methods of estimation industrial risk is describe.

Область исследования:
(Archived) Technological machinery and equipment of mining and oil & gas industries
Funding:

None

Go to volume 178

Similar articles

Justification of the optimal mode of operation of the mine pumping unit at the design stage
2008 O. V. Kabanov, V. S. Solov'ev, S. O. Kabanov
Justification of parameters of the hydraulic turbine for the drive mechanisms at deep-water mining of solid minerals
2008 B. S. Makhovikov, N. A. Ekimov
Pilot diagnostics of mining machines transmissions state by parameters of electric drive supply
2008 A. A. Poddubnaya, A. S. Fokin, S. L. Ivanov, A. S. Ivanov, M. A. Semenov
Influence of engine damping properties on dynamics of mechanical part of combine harvester
2008 A. S. Solov'ev, Ya. P. Grinberg, V. S. Solov'ev
Determination of safety degree of underwater crossings of gas-pipelines in difficult engineering-geological conditions
2008 O. I. Dzardanov
Elimination of complications and accidents during deep well drilling in glaciers
2008 N. I. Vasiliev, P. G. Talalay, V. M. Zubkov, A. V. Krasilev, M. V. Zubkov