Submit an Article
Become a reviewer
Vol 180
Pages:
217-220
Download volume:
RUS
Article

To the question of increase of stability of quarry sides at contour explosion due to application of gel-like explosives

Authors:
M. S. Shalaev1
G. P. Paramonov2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-07-08
Date accepted:
2008-09-13
Date published:
2009-02-18

Abstract

In exploitation of deep open-pit one of the main problems is increasing stability pit wall during making it in final position. As is generally known, to provide over contour massive in safety is used one of widespread blasting method – the pre-split blasting. In given work is proposed to use gel explosive Gelpor GP-2У to make a quality reflection crack for Kostomuksha ore open pit geological structure. Were made a calculation of basic parameters in pre-blasting method with using gel explosive Gelpor GP-2У and given estimation of calculation result with experimental data, using on Kostomuksha ore open pi in pre-split blasting.

Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Go to volume 180

Similar articles

Determination of rational parameters of foam plastic elements for creation of air spaces of borehole charges
2009 A. V. Leshchinskiy, E. B. Shevkun
Low-waste and environmental technology of mining of minerals at quarries with the help of hydraulic hammers
2009 G. A. Kholodnyakov, D. N. Ligotskiy, A. V. Polovinko
Distributed systems of regulation of thermal regime of mines and ore-makers of the North
2009 A. F. Galkin
Increase of efficiency and environmental safety of rock crushing by borehole charges at dredging works
2009 A. A. Andreev
Ways to optimize the parameters of drilling and blasting operations during mining of chambers of Maleevsky mine by the method of borehole charges on the basis of consideration of rock mass properties
2009 V. A. Artemov, S. V. Shcherbich
Experience of using emulsion compositions and optimization of BVR parameters during stripping of overburden and kimberlites at the quarry of the Yubileynaya pipe of Aikhal Mining and Processing Division
2009 V. F. Kostyrin