To the question of increase of stability of quarry sides at contour explosion due to application of gel-like explosives
About authors
- 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
Abstract
In exploitation of deep open-pit one of the main problems is increasing stability pit wall during making it in final position. As is generally known, to provide over contour massive in safety is used one of widespread blasting method – the pre-split blasting. In given work is proposed to use gel explosive Gelpor GP-2У to make a quality reflection crack for Kostomuksha ore open pit geological structure. Were made a calculation of basic parameters in pre-blasting method with using gel explosive Gelpor GP-2У and given estimation of calculation result with experimental data, using on Kostomuksha ore open pi in pre-split blasting.
Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Funding:
None
Similar articles
Improvement of the technology of calculation of dangerous distances for rock pieces at mass explosions at quarries
2009 A. V. Zharovkin
Determination of investment efficiency at realization of ore quarry projects
2009 S. I. Fomin, D. V. Pasynkov, A. S. Semyonov
Low-waste and environmental technology of mining of minerals at quarries with the help of hydraulic hammers
2009 G. A. Kholodnyakov, D. N. Ligotskiy, A. V. Polovinko