Submit an Article
Become a reviewer
Vol 181
Pages:
138-140
Download volume:
RUS
Article

Justification of parameters and design of auger loader of tunneling-cleaning combine

Authors:
D. A. Sidyakin
About authors
  • Perm State Technical University
Date submitted:
2008-08-21
Date accepted:
2008-10-17
Date published:
2009-03-20

Abstract

It is established that the hub diameter critically affects the performance of the auger-type heading-and-winning machines. To secure the maximal output the hub diameter should be 3.3 times smaller than the auger blade diameter.

Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Funding:

None

Go to volume 181

Similar articles

Studies on decomposition of artificial scheelite by sintering with ammonium chloride
2009 A. V. Esipenko, A. A. Sotnikov
Optimization of a mode of thermal modification of torphomineral binding materials
2009 E. O. Savel'eva
Complex of geophysical signs of localization of gold-sulphide type mineralization (Lena gold ore district)
2009 S. V. Sokolov
Cutting technology with point attack picks on roadheaders and its challenges
2009 Hubert Kargl
Material composition of ore of host rocks of the Amurskoye zinc deposit (Southern Urals)
2009 Yu. N. Spesivtseva
Organization of mining works at preparation of new horizons at watered open pits
2009 I. I. Dudanov, V. S. Avraamov, D. N. Ligotsky, G. A. Kholodnyakov