Justification of reliability of cantilever-rope reinforcement of deep shafts
Authors:
About authors
- G.V. Plekhanov Saint Petersburg State Mining Institute
Abstract
A possibility of combined operation of the rope and console shaft armouring is studied. A device is offered to secure their combined operation. Calculation dependences are given to assess stress in the device elements as well as graphical dependences to select sizes of these elements.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:
None
Similar articles
Estimation of the level of maintainability of complex energy components under operating conditions
2009 I. I. Nikolaenkov
Hydraulic calculation of multiphase hydrocarbon flow with application of the OLGA dynamic modeling system
2009 D. A. Shchekotov
Management of the process of purposeful creation of technogenic deposit of certain quality
2009 A. Ishimov, K. Drebenshtedt