Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 181

Similar articles

Improvement of quality of manufacture of petrochemical devices and gas-oil pipelines by application of vibration treatment during welding
2009 O. F. Khafizova
Substantiation of a reservoir model for one of the fields in the Ob River Region in order to improve development efficiency
2009 A. A. Shelushenko
Technology of enterprise value management
2009 T. A. Klevtsova
Problem of organic wastes and veritechnology as a variant of its solution in the Republic of Mordovia
2009 S. V. Kovshov
Influence of blast waves on the stressed state of the barrier pillar at carrying out of parallel excavations
2009 Yu. N. Antonov
Small speed asymptotic stability study of a speed vector control system for an induction motor that contains in its loop a Gopinath observer
2009 Olimpiu Stoicuta, Nadia Stoicuta, Teodor Pana