Submit an Article
Become a reviewer
Vol 181
Pages:
61-63
Download volume:
RUS

Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Go to volume 181

Similar articles

Improvement of quality of manufacture of petrochemical devices and gas-oil pipelines by application of vibration treatment during welding
2009 O. F. Khafizova
Theoretical analysis of thermal regime of foundations and base soils
2009 D. N. Gorobtsov
Small speed asymptotic stability study of a speed vector control system for an induction motor that contains in its loop a Gopinath observer
2009 Olimpiu Stoicuta, Nadia Stoicuta, Teodor Pana
Prospects of development of ferrous metals of Polar and Subpolar Urals
2009 A. B. Anisimova
Search of ways to increase technological indicators at processing of charge of rich and copper ores
2009 I. M. Zemenkov
Optimization of operation modes of gas pumping units in the system of compressor station compression
2009 V. V. Kichatov