Submit an Article
Become a reviewer
Vol 181
Pages:
61-63
Download volume:
RUS
Article

Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-03-20

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 181

Similar articles

Justification of parameters and design of auger loader of tunneling-cleaning combine
2009 D. A. Sidyakin
Geological-statistical and economic substantiation of deep drilling on Kolvinskaya area
2009 E. A. Moskovtsova, N. V. Devyatkova
Application of asynchronous motors with double supply and vector regulation as generators for wind power stations
2009 I. Imenokhoev
Informativeness of transient characteristics of fast processes of induced polarization in the search for gold-sulfide ores
2009 M. A. Beznosov
Respirator-conditioner for work in the conditions of the North
2009 N. A. Kotenkov
Research of influence of magnetic field on foaming properties of VKP reagent and flotation of graphite ore of different sites of Taiga deposit
2009 I. R. Masyagutova