Submit an Article
Become a reviewer
Vol 181
Pages:
61-63
Download volume:
RUS

Organization of mining works at preparation of new horizons at watered open pits

Authors:
I. I. Dudanov1
V. S. Avraamov2
D. N. Ligotsky3
G. A. Kholodnyakov4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg State Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-04
Date accepted:
2008-10-11
Date published:
2009-02-01

Abstract

To prevent decline in quarry production and create favorable operating conditions for the equipment in advancing watered open-pits it is recommended to employ hydraulic back shovels, which due to their cinematic and design features can perform downward digging while being located on the dry upper bench surface.

Go to volume 181

Similar articles

Study of regularities of copper and zinc extraction from model solutions of sub-dump water
2009 M. I. Zubchuk
Economical model for maintenance of electric distribution system
2009 Juha Korpijärvi
Studies on decomposition of artificial scheelite by sintering with ammonium chloride
2009 A. V. Esipenko, A. A. Sotnikov
Development of the device and technology of diagnostics of anchoring of rocks and building structures
2009 E. A. Voznesensky
Improvement of quality of manufacture of petrochemical devices and gas-oil pipelines by application of vibration treatment during welding
2009 O. F. Khafizova
Reconstruction of vertical shaft of Uzelginsky mine
2009 D. E. Zhurov