Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport
Authors:
About authors
- Ph.D. Associate Professor Tyumen State Oil and Gas University
Abstract
Minimization of economic losses from downtime of equipment and, first of all, off-schedule (breakdowns, accidents) is an actual problem whose solution can be achieved by the development and creation of a reserve stocks (irreducible level) materials and spare parts of electrical equipment. As a result of the study and comparative analysis of different methods for determining the amount of the reserve stocks has been concluded that these approaches are not fully reflect the real needs of the enterprise. In this regard, has developed an optimal method for determining the amount of irreducible level of reserve stocks of electrical equipment, taking into account the rational order of delivery of equipment, spare parts.
Область исследования:
(Archived) Economical aspects in the developments оf fuel & energy complex
Keywords:
reserve stocks
norm of reserve
irreducible level
electrical equipment
energy object
main transportation of gas
delivery of equipment
spare parts
Funding:
None
References
- Kolpachkov V.I., Yaschura A.I. Production exploita- tion, technical service and repair of power equipment: Refer- ence book. Moskow, 1999.
Similar articles
The methodological principles of an economic estimation оf secondary mineral resources from an item of a system approach
2009 P. V. Berezovskiy
The influence of the technological and organizational factors on the steady growth of the mining industry
2009 E. M. Pronin, V. E. Vasiliev