Submit an Article
Become a reviewer
Vol 185
Pages:
25-30
Download volume:

Higher grade filling due to horizontal layers extraction in Yakovlevsky ore deposit

Authors:
V. P. Zubov1
A. A. Antonov2
Yu. N. Lugovskoi3
M. D. Morozov4
O. V. Mikhailenko5
About authors
  • 1 — Ph.D., Dr.Sci. Professor Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. Associate professor Saint Petersburg State Mining Institute (Technical University)
  • 3 — Engineer Saint Petersburg State Mining Institute (Technical University)
  • 4 — Postgraduate student Saint Petersburg State Mining Institute (Technical University)
  • 5 — Engineer Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-07-22
Date accepted:
2009-09-18
Date published:
2010-01-01

Abstract

A complex of technology and organization methods to higher grade filling due to horizontal layers system of extraction rich ferrous metal ores for various stages of mining is presented.

Keywords:
horizontal layers system of extraction grade of filling drifts roof falling safety
Go to volume 185

References

  1. Зубов В.П. Концепция отработки Яковлевского железорудного месторождения на участках богатых железных руд / В.П.Зубов, А.А.Антонов / Записки Горного института. СПб, 2006. Т.168. С.203-210.

Similar articles

Control of deformations of buildings and constructions at the built-up territories within mining diversions of oil and gas fields under conditions of Far North
2010 Yu. I. Kantemirov, Yu. B. Baranov, E. V. Kiselevskii, V. V. Bilyansky, S E. Nikiforov, V. G. Gryaznov, M. A. Bolsunovsky, Robert Lanzl
Active methods for control of geomechanical state of rock mass in coal deposit mining under complicated geological-and-mining conditions
2010 F. N. Voskoboev, Yu. A. Semenov, V. A. Zvezdkin
Influence of tectonic stresses and geological disturbances in rock mass on the parameters of stress-strain state around mine workings
2010 D. N. Petrov, I. S. Dolgy, V. I. Ochkurov
Methods for presetting of artificial yielding to anthracite pillars
2010 S. G. Stradanchenko, N. V. Titov, Yu. V. Turuk
Efficient numerical methods for geotechnical problems
2010 M. A. Karasev
Provision of safe coal mining with due account оf cleanup works at adjacent seams
2010 M. A. Ilyashov