Submit an Article
Become a reviewer
Vol 185
Pages:
199-204
Download volume:
RUS
Article

Methods for calculation of methane reserves in coal seams as independent mineral resource

Authors:
N. M. Storonskii1
V. T. Khryukin2
E. V. Shvachko3
A. V. Kirilchenko4
D. V. Mitronov5
D. A. Sizikov6
About authors
  • 1 — Ph.D. deputy general director GASPROM PROMGAS Co.
  • 2 — Ph.D. head of department «Coalbed Methane» GASPROM PROMGAS Co.
  • 3 — head of lab. of geology and coalbed methane deposits GASPROM PROMGAS Co.
  • 4 — leading engineer GASPROM PROMGAS Co.
  • 5 — канд. геол.-минерал. наук head of sector of geology and methane reserves GASPROM PROMGAS Co.
  • 6 — leading specialist «LORES» Co.
Date submitted:
2009-07-03
Date accepted:
2009-09-10
Date published:
2010-04-22

Abstract

Development of nonconventional resources of natural gas such as coalbed methane (CBM) demands new approaches to reserves’ calculation and economic estimation of coalbed methane fields. Experts of OS «Gazprom promgaz» have developed the method of CBM reserves calculation as independent mineral based on international and russian experience in CBM fields prospecting and production activity of CBM. The article is devoted to basic principles of new technique on an example of Taldinskoe CBM field reserves’ calculation.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Keywords:
nontraditional resources methane of coalbearing strata: prospecting of methane coal deposits calculation of methane reserves
Funding:

None

Go to volume 185

Similar articles

Financial security and structure of national interests of Russia
2010 E. N. Kondrat
Efficient assessment of stress state of coal seams liable to rock bursts
2010 F. P. Ivchenko, N. V. Krotov
The use of data on stress-strain state of rock mass in solutions of mining-and-technical tasks on the example of the Tishin ore mine
2010 Yu. A. Kashnikov, S. G. Ashikhmin, D. V. Shustov, A. I. Ananin, A. E. Fandeev
Higher grade filling due to horizontal layers extraction in Yakovlevsky ore deposit
2010 V. P. Zubov, A. A. Antonov, Yu. N. Lugovskoi, M. D. Morozov, O. V. Mikhailenko
Method of calculation stability of the open pit edges
2010 A. V. Chebakov
Account and movement of reserves in the information system of Silvinit co.
2010 A. V. Kataev, S. N. Kutovoi, E. M. Efimov, M. V. Gilev