Submit an Article
Become a reviewer
Vol 185
Pages:
279-284
Download volume:
RUS
Article

Account and movement of reserves in the information system of Silvinit co.

Authors:
A. V. Kataev1
S. N. Kutovoi2
E. M. Efimov3
M. V. Gilev4
About authors
  • 1 — Ph.D. Associate professor Permian State Technical University
  • 2 — Ph.D. Associate professor Permian State Technical University
  • 3 — engineer Permian State Technical University
  • 4 — chief mine surveyor Silvinit Co.
Date submitted:
2009-07-12
Date accepted:
2009-09-08
Date published:
2010-04-22

Abstract

At ore mines of the Silvinit Co. for accounting and movement of reserves are developed and used special tools, using GIS within the information system. Their use allows to automate accounting and monitoring of status and movement of stocks, including the formation of the reporting tables.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Keywords:
software geoinformation system technologies for account of reserves output and loss of salts mining technology coincided sections of chamber and extraction unit (combine and salt bed)
Go to volume 185

References

  1. Automated working place of a mine surveyor on basis of digital plans of mining operations / A.V.Kataev, S.N.Kustovoy, A.V.Telitsyh, E.V.Nesterov, M.V.Gilev // Mine Surveying Vestnik. 2003. N 2. Pp.28-31.
  2. Borzakovsky B.A., Papulov L.M. Packing works at the Verkhnekamsk potash ore mines: Reference book. Moscow: Nedra, 1994. 234 р.
  3. The Instruction for the determination, account and normalization of exploitation losses and impoverishment of productive seams for ore mines of Uralkaliy Co. and Silvinit Co. Saint Petersburg, 2000. 63 р. -
  4. Development of the conception of the information system of the Silvinit Co. / A.Y. Kataev, S.N. Kutovoy. E. V. Nesterov, M.V.Gilev // XIII Int. Congress on Mine Surveying Art. Budapest, 2007.
  5. Directions on protection of ore mines from flooding and protection of undermined objects under conditions of the Verkhnekamsk deposit of potash salt (technological regulations). Saint Petersburg, 2008. 88 р.

Similar articles

Active methods for control of geomechanical state of rock mass in coal deposit mining under complicated geological-and-mining conditions
2010 F. N. Voskoboev, Yu. A. Semenov, V. A. Zvezdkin
Preconditions for application of supports of different types in productive workings of low-thick gently-pitching deposits in tectonically stressed massif (for conditions of the Karnasurt ore mine)
2010 A. V. Lovchikov, A. V. Matytsyn
Influence of rock disturbance on their rheological properties
2010 M. D. Ilyinov, Yu. M. Kartashov, A. T. Karmanskii, V. A. Kozlov
Higher grade filling due to horizontal layers extraction in Yakovlevsky ore deposit
2010 V. P. Zubov, A. A. Antonov, Yu. N. Lugovskoi, M. D. Morozov, O. V. Mikhailenko
Influence of tectonic stresses and geological disturbances in rock mass on the parameters of stress-strain state around mine workings
2010 D. N. Petrov, I. S. Dolgy, V. I. Ochkurov
Diagnostics of stability of a mine working in a protective pillar
2010 V. A. Smirnov, A. G. Olovyanny, B. N. Samorodov, A. V. Smirnova