Organization and conduct of monitoring of geodynamic processes at the Grushovaya transshipment oil base of the Chernomortransneft Co
Authors:
About authors
- Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
Abstract
The complex of geophysical methods and equipments for continuous and periodic monitoring of the influence of present-day geodynamic processes on support and rocks along the route of technological tunnel of3300 mlong within the zone of high seismicity has been developed.
Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Similar articles
Higher grade filling due to horizontal layers extraction in Yakovlevsky ore deposit
2010 V. P. Zubov, A. A. Antonov, Yu. N. Lugovskoi, M. D. Morozov, O. V. Mikhailenko
Account of stress gradients in rock mass in designing of mining constructions
2010 S. V. Suknyov, M. D. Novopashin
The determination of the volume stress-strain conditions of the rock massive with the circular outline mining ensrined with the anchors
2010 A. G. Protosenya, N. A. Belyakov
Numerical assessment of stress-strain field in vicinity of large open pit mine taking into account geomechanical, geological and mining factors
2010 A. A. Kozyrev, I. E. Semionova, V. V. Rybin, I. M. Avetisyan