Submit an Article
Become a reviewer
Vol 185
Pages:
175-179
Download volume:
RUS
Article

Method of calculation stability of the open pit edges

Authors:
A. V. Chebakov
About authors
  • Postgraduate student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-07-09
Date accepted:
2009-09-01
Date published:
2010-04-22

Abstract

During the opencast mining operations with bating and opening-up of new horizons as a result of the process duration in the near-edge rock mass, fatigue accumulates, which leads to slope deformations in the form of slide rocks, rock falls, roof breaks, and, in some cases, large-scale landslides. Given that the open pit edges are complex engineering structures, on the state of which mining operations effectiveness and safety depend, their stability control is a very urgent problem.

Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Keywords:
stability of the open pit edges displacement deformation
Funding:

None

Go to volume 185

References

  1. Methodical instructions on supervision over deformations of boards of cuts and sailings, interpretations of their results and to the stability forecast. Leningrad, 1987. 118 р.
  2. Pustovoytova T.K. Perfection of methods of calculation stability of slopes / T.K.Pustovoytova, A.M.Mochalov. A.N.Gurin // the Collection of proceedings «70 years
  3. VNIMI». VNIMI. Saint-Petersburg, 1999. 3. Fisenko G.L. Stability of boards of open-cast mines and sailings. Moscow: Nedra, 1965. 378 р.

Similar articles

Investigation of stress-strain state of floor of the dividing mass of deep-lying ore mines at Тalnakh
2010 V. A. Zvezdkin, B. Yu. Zuev, V. M. Klimkina, A. G. Anokhin, T. P. Darbinyan
Simulation of the stress-strain state forming around the vertical mine in the field of tectonically fractured massif
2010 D. Yu. Dordzhiev
Mathematical modeling of deformation processes and failure in fractured rock mass
2010
Influence of tectonic stresses and geological disturbances in rock mass on the parameters of stress-strain state around mine workings
2010 D. N. Petrov, I. S. Dolgy, V. I. Ochkurov
Active methods for control of geomechanical state of rock mass in coal deposit mining under complicated geological-and-mining conditions
2010 F. N. Voskoboev, Yu. A. Semenov, V. A. Zvezdkin
New technologies of conducting mine surveying works
2010 S. P. Smirnov