Submit an Article
Become a reviewer
Vol 185
Pages:
158-160
Download volume:
RUS
Article

Methods for presetting of artificial yielding to anthracite pillars

Authors:
S. G. Stradanchenko1
N. V. Titov2
Yu. V. Turuk3
About authors
  • 1 — Ph.D., Dr.Sci. The Novocherkassk Polytechnical Institute
  • 2 — Ph.D., Dr.Sci. Professor The Novocherkassk Polytechnical Institute
  • 3 — Ph.D. senior lecturer The Novocherkassk Polytechnical Institute
Date submitted:
2009-07-20
Date accepted:
2009-09-24
Date published:
2010-04-22

Abstract

The article contains the results of in situ investigation of influence of yielding pillars on the stability of protected workings with different modes of preset yielding. Graphs of roof movements in the workings protected with yielding pillars, are given.

Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
Keywords:
criteria for assessment of arrangements for provision of yielding of pillars particular features of geomechanical state of pillars at anthracite seams comparison of methods for presetting the yielding of pillars
Funding:

None

Go to volume 185

References

  1. Titov N.V. Ways for higher efficiency of mining of thin and average-thichness of flat-lying anthracite seams / N.V.Titov, A.A.Privalov, Yu. V. Turuk. Rostov on Don: Publ J.Izv.Sev.-Kavk. region, 2006. 196 р.

Similar articles

Main problems of institutional subsurface resources management in the Russian potash industry
2010 V. P. Skobelina, T. V. Ponomarenko
Account of stress gradients in rock mass in designing of mining constructions
2010 S. V. Suknyov, M. D. Novopashin
Development of geothermal resources – higher efficiency in utilization of the earth’s interior
2010 E. I. Boguslavsky
Preconditions for application of supports of different types in productive workings of low-thick gently-pitching deposits in tectonically stressed massif (for conditions of the Karnasurt ore mine)
2010 A. V. Lovchikov, A. V. Matytsyn
Influence of tectonic stresses and geological disturbances in rock mass on the parameters of stress-strain state around mine workings
2010 D. N. Petrov, I. S. Dolgy, V. I. Ochkurov
Mathematical modeling of deformation processes and failure in fractured rock mass
2010