Submit an Article
Become a reviewer
Vol 189
Pages:
236-239
Download volume:
RUS
Article

Substantiation of way unloading pillar in tectonically fractured massif

Authors:
A. G. Protosenya1
D. Yu. Dorzhiev2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-11
Date accepted:
2010-09-02
Date published:
2011-03-21

Abstract

Simulation-based finite element method of forming the features of the stress-strain state in pillar at the ore body downstream horizontal layers with a mined-out space. The obtained regularities of redistribution of stresses in pillar and surrounding rock massif are allowed to substantiate an effective way to reduce the bump hazard in mining  operations.

Область исследования:
(Archived) Geomechanics, geodesy, mine surveying and cadastre
Funding:

None

Go to volume 189

Similar articles

Database development real estate rural municipalities
2011 V. G. Gorelikov, E. Yu. Ionova
Two genetic types of peristerites in iridescent plagioclases
2011 M. A. Ivanov, A. P. Simakov
Simulation of swinging movement autoresonant electric drive with nonsymmetric excitation
2011 A. N. Fomenko
Mathematical modelling of roastng of calc- nepheline and cement mixture in tubular rotary kilns
2011 O. V. Titov
Usage of simulation modeling for planning and interpretation experimental-filtrational works when prospecting solid mineral product deposit
2011 S. N. Kotlov, K. E. Volodchenko
Intensification of anion sorption of iridium with highly basic anionite amp from sulfate solutions
2011 G. V. Petrov, V. N. Kovalev