Geomechanical substantiation of optimal parameters of pillars in multientey scheme of coal seams development

Authors:
S. G. Kokoev
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-26
Date accepted:
2010-09-12
Date published:
2011-01-01

Abstract

Abstract: It is suggested the method for  the determination  of interentry pillars in  mining  the seams prone to rock bursts. The width of pillars is determined depending on  the  seam thickness and depth of mining  operations.

Go to volume 189

References

  1. Казанин О.И. Интенсивная отработка высокогазоносных угольных пластов на больших глубинах / О.И.Казанин, Г.Д.Задавин // МАНЭБ. СПб, 2007. 240 с.
  2. Коршунов Г.И. Многоштрековая подготовка угольных пластов / Г.И.Коршунов, А.К.Логинов, В.М.Шик. СПб.: Наука, 2007. 251 с.
  3. Кокоев С.Г. Оценка напряженного состояния системы межштрековых целиков при подготовке к выемке удароопасных пластов // Горный журнал. 2010. № 3 С 39-42.
  4. Расчетные методы в механике горных ударов и выбросов: Справочное пособие /И.М.Петухов, А.М.Линьков, В.С.Сидоров и др. М.: Недра, 1992. 256 с.

Similar articles

To the estimation of the rate of discounting for complex manufacture
2011 P. A. Zhigulevich
Forming of the composition of hydrotermal solutions in hydrogeological massifs of ultrabasic rockes of the Mid-Atlantic ridge
2011 S. M. Sudarikov, M. V. Krivitskaya
Calculation methodology of physical parameters of the artificial pillar barrier
2011 M. N. Adreev
Parameters of high viscosity oils transportation in the form of emulsion research in order to its optimization
2011 V. I. Aleksandrov, A. P. Khrabrov
Improvement development of technology for processing electronic scrap concentrates
2011 T. A. Aleksandrova, A. N. Telyakov
Engineering-geological substantiation of reshaping wave-built solid masses with partial removal of hydraulic mine dump
2011 I. V. Kuznetsova, V. P. Zharikov