Article

Calculation methodology of physical parameters of the artificial pillar barrier

Authors:
M. N. Adreev
About authors
  • post-graduate student Saint Petersburg State Mining Institute (Technisal University)
Date submitted:
2010-07-21
Date accepted:
2010-09-08
Date published:
2011-03-21

Abstract

The article is devoted to the calculation methodology of physical parameters of the artificial barrier pillar needed when developing underquarry deposits of kimberlitic pipes in difficult hydrogeological conditions.

Область исследования:
(Archived) Development of solid mineral deposits
Keywords:
Kimberlitic tubes underquarry reserves water-bearing level compound of backfill material
Funding:

None

Go to volume 189

References

  1. Alborov Z.B. Development of foreign deposits beneath the ponds and rivers. Moscow: Nedra, 1965.
  2. Borisov A.A. Rock mechanics and arrays. Moscow: Nedra, 1980.
  3. Kazikaev D.M. Joint development of ore deposits of the open pit and underground. Moscow: Nedra, 1967.
  4. Kaplunov D.R. Design principles of combined technologies during the development of major mineral deposits //
  5. Mining magazine. №10. 2003.
  6. Kaplunov D.R. Development of design theory, the integrated development of mineral resources in the development
  7. of the development of ore deposits // Mining magazine. 2005.
  8. Kartashov Y.M. Strength and deformability of rocks / Y.M.Kartashov, B.V.Matveev, G.V.Mikheev, A.B.Fadeev. Moscow: Nedra, 1980.
  9. Klishin V.I. Optimization of the depth of the transition from open to underground method of mining of kimberlite deposits / V.I.Klishin., A.A.Ordin, A.S.Zelberg.// Mining magazine. 2003. № 4.

Similar articles

Usage modern computer techniques for validation of actions guaranteeing opening strength of pit edge
2011 S. N. Kotlov
Modelling cavities nearwell areas for studyind of possibilities neitron well methods
2011 N. A. Poznyakova
Influence of action of underground waters on deformation of the open pit edges
2011 A. G. Protosenya, A. V. Chebakov
Experimental research of the train aerodynamic resistance
2011 V. A. Pleskunov
Software of automation of the decision of the linear notch and equalizing of network triangulation with measured lengths
2011 Shakhin Ali Fuad
Non-destructive strength testing of anodic bonding conductor-to ionic dielectric seals
2011 N. S. Pshchelko