Submit an Article
Become a reviewer
Vol 189
Pages:
222-225
Download volume:
RUS

The model of productivity of forest land

Authors:
V. F. Kovyazin1
E. A. Lagutenko2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-21
Date accepted:
2010-09-18
Date published:
2011-03-21

Abstract

The model of efficiency of the earths of forest land allows to calculate  a  forest  stand  stock on a forest plot, characterized by certain natural factors (agroclimatic and geomorphological areas, an amount of precipitation, height above sea level, a kind of quaternary adjournment). Stock-taking of communications between natural factors and efficiency  of  the earths of wood fund is executed, the equation of regress is constructed and its statistical estimation is executed.

Ковязин В.Ф., Лагутенко Е.А. Модель продуктивности земель лесного фонда // Записки Горного института. 2011. Т. 189 . С. 222-225.
Kovyazin V.F., Lagutenko E.A. The model of productivity of forest land // Journal of Mining Institute. 2011. Vol. 189 . p. 222-225.
Go to volume 189

References

  1. Лесной кодекс Российской Федерации от 04.12.2006. № 200-ФЗ в ред. от 22.07.2010. № 167-ФЗ // Российская газета. 31.12.2010. №5376.
  2. Статистика: Учеб. пособие / Л.П.Харченко, В.Г.Долженкова, В.Г.Ионин и др./ Под ред. В.Г.Ионина. М.: ИНФРА-М, 2006. 384 с.
  3. Теория статистики: Учебник / Р.А.Шмойлова, В.Г.Минашкин Н.А.Садовникова и др. / Под ред. Р.А.Шмойловой. М.: Финансы и статистика, 2009. 656 с.

Similar articles

Value Δ34S in millerite and genesys of clinochlore-brindleyite-chamosite nickel ores in the Elov supergene deposit (North Urals)
2011 O. P. Mezentseva, I. V. Talovina
Substantiation of way unloading pillar in tectonically fractured massif
2011 A. G. Protosenya, D. Yu. Dorzhiev
Actual ways of increasing the effectiveness of facilities for hydrotransport mountain companies
2011 A. A. Velnikovskiy
Efficiency increasing of condenser batteries operation in mining enterprise`s electric circuits
2011 A. N. Skamin
Selection of parameters camouflet blasting to reduce bump hazard by development uranium deposits
2011 D. Yu. Dordzhiev
The analysis of sufficiency and reliability of market information in small and average settlements in the Northwest district for estimation of the statistical method of ground area cadastral cost definition application possibility
2011 V. A. Kiseleva, O. Yu. Lepikhina