Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — ZF OJSC «MMC «Norilsk Nickel»
- 3 — ZF OJSC «MMC «Norilsk Nickel»
- 4 — ZF OJSC «MMC «Norilsk Nickel»
Abstract
The reasons that complicate the process of elaboration dividing arrays of deep mines Talnakh. The analysis of the formation of stress-strain state dividing arrays during the development of treatment work. Practical advice on management strains and stresses in underworking Block structures dividing arrays.
Область исследования:
(Archived) Geomechanics
Similar articles
Account of influence of fracturing of stony and semistony rocks on the strength of rock mass in evaluation of stability of open-pit slopes by prospecting data
2011 A. M. Mochalov, S. V. Kagermazova, G. A. Grebenshchikova
The engineering geological control of underground transport tunnels exploitation reliability in Saint Petersburg
2011 R. E. Dashko, P. V. Kotyukov
Assessment of safety factor for analysis of stability of boards of open-cast mines
2011 V. V. Zubkov, I. A. Zubkova
Thermal strengthening of loosened soils and rocks during mining operations
2011 V. A. Smirnov, E. N. Rabota, E. V. Goncharov