The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
- 4 — «Metal-groupp» Co.Ltd., «Yakovlevskiy pit»
Abstract
The methodic of the field observation for the processes of deep benchmark displacements and configuration of the local observing station is offered. The analysis of the results of the field observations for the displacements of the ore pillar is accomplished, the isolines of settling and the isolines of the average speed of settling of the ore massif is offered.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
The determination of the volume stress-strain conditions of the soil massif in the face area of the tunnel in conditions of drafting with using of contledge of the face
2011 A. G. Protosenya, N. A. Belyakov
Exploitational problems of the kholodninskoye polimetallik deposit mining
2011 V. P. Zubov, O. V. Mikhailenko
Substantiation of rational mining parameters for iv potash horizon of the starobin potash deposit
2011 O. V. Kovalev, S. P. Mozer, I. Yu. Mozer, A. V. Leisle