The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
- 4 — «Metal-groupp» Co.Ltd., «Yakovlevskiy pit»
Abstract
The methodic of the field observation for the processes of deep benchmark displacements and configuration of the local observing station is offered. The analysis of the results of the field observations for the displacements of the ore pillar is accomplished, the isolines of settling and the isolines of the average speed of settling of the ore massif is offered.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
Calculation moving and deformations used functions of typical curves, analytically expressed
2011 E. S. Rozhnov
The choice of mining methods for the near-ore bank reserves of the Koashva deposit
2011 A. B. Koreivo, A. G. Zileev
Substantiation of rational mining parameters for iv potash horizon of the starobin potash deposit
2011 O. V. Kovalev, S. P. Mozer, I. Yu. Mozer, A. V. Leisle
Mathematical modelling of geomechanical processes at the estimation of influence of building underground constructions in cities on the undermined rock mass
2011 E. M. Volokhov, D. A. Potemkin