Estimation methods of ore storage’s capacity for opencast startup time

Authors:
G. A. Kholodnyakov1
M. M. Yakubovskii2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-21
Date accepted:
2010-10-11
Date published:
2011-02-01

Abstract

It is considered the technique of definition of ore warehouse’s capacity for the period of opencast development. This period is characterized by non-uniform opencast’s productivity on a mineral. The technique allows to estimate an initial ore warehouse’s stock, which is necessary for concentrating factory’s stable work, the possible moment of factory’s starting, and also dynamics of ore’s stocks at warehouse during period under review mining enterprise work.

Go to volume 190

References

  1. Буянов Ю.Д. Определение емкости промежуточных складов дробильно-сортировочных заводов // Строительные материалы. 1977. № 2.
  2. Васильев М.В. Внутрикарьерное складирование и перерузка руд. М.: Недра, 1968.
  3. Васильев М.В. Комбинированный транспорт на карьерах. М.: Недра, 1975.
  4. Истомин В.В. Установление вместимости перегрузочного пункта с учетом надежности работы погрузочно-транспортных комплексов оборудования // Горный информационно-аналитический бюллетень / МГГУ. М., 1993. Вып.7-8 (10-11).

Similar articles

Designing support unilateral rectangular interfase of horizontal developments
2011 Yu. N. Ogorodnikov, V. I. Ochkurov, D. N. Petrov
The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
2011 V. V. Karpenko, Yu. N. Ogorodnikov
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
Account of influence of fracturing of stony and semistony rocks on the strength of rock mass in evaluation of stability of open-pit slopes by prospecting data
2011 A. M. Mochalov, S. V. Kagermazova, G. A. Grebenshchikova
Calculation moving and deformations used functions of typical curves, analytically expressed
2011 E. S. Rozhnov
Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov