Submit an Article
Become a reviewer
Vol 190
Pages:
101
Download volume:

Providing of safe conditions for mining оf shaftbottom protective pillars in deep ore mines at Talnakh

Authors:
V. A. Zvezdkin1
V. N. Karenin2
A. G. Anokhin3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — ZF OJSC «MMC «Norilsk Nickel»
  • 3 — ZF OJSC «MMC «Norilsk Nickel»
Date submitted:
2010-08-20
Date accepted:
2010-10-13
Date published:
2011-02-01

Abstract

Consideration is given to the causes complicating the mining of shaftbottom pillar and protection of shaft lining. The analysis is given of the formation of stress-strain state of the protective pillar and its enclosing rocks. Practical recommendations are given for control of deformationand stresses in the shaftbottom mass during extraction of protective pillars in deep ore mines at Talnakh.

Go to volume 190

References

  1. Кузнецов С.Т. Разупрочнение труднообрушаемых кровель угольных пластов / С.Т.Кузнецов, Ю.А.Семенов, В.П.Шишкин. М.: Недра, 1987. 231 с.
  2. Каталог рекомендуемых способов управления геомеханическим состоянием горного массива для угольных шахт России / Ф.Н.Воскобоев, В.А.Звездкин, Ю.А.Семенов и др.; ННЦГП ИГД им. А.А.Скочинского. М., 2003. 147 с.

Similar articles

Connection between lumpiness and block size оf mined rock from photographs using computer processing research
2011 A. P. Sannikova
Geodinamical variability as a cause of natural disasters and technogenic catastrophes
2011 L. K. Gorshkov, Z. B. Dekusar
Some approaches to evaluate the stability of underground structures subjected to dynamic loads from earthquakes
2011 E. R. Kovalskii, S. P. Mozer, O. V. Mikhailenko, S. A. Sidorenko
Gamma fields dynamic dosage perfomances possibilities for diagnostics and control of radiation and nuclear accidents on nuclear power underground facilities group
2011 V. G. Kondratev
Method of description of air flow inside goaf of longwall with caving in underground coal mines
2011 Yan Shlonzak
Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
2011 V. V. Ivanov