Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
Authors:
About authors
- Saint Petersburg State Mining Institute (Technical University)
Abstract
The work describes basic features of open pit development of complex structure carbon deposits. The rational length of excavator block for different models of dragline for backfill mining method was determined. The work also gives the dependence for determining the production front length for development of complex structure carbon deposits with the use of railway service for transportation of the extracted mineral.
Область исследования:
(Archived) Geotechnology
Funding:
None
Similar articles
Subsidence and deformations of layers of the massif of rocks with formation of technogenic water spending cracks
2011 V. N. Gusev, E. S. Rozhnov
Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
The choice of mining methods for the near-ore bank reserves of the Koashva deposit
2011 A. B. Koreivo, A. G. Zileev
Development of tecnological shemes of the selective extraction of the complex potash seams under conditions of the starobin deposit
2011 O. V. Kovalev, E. R. Kovalskii, Yu. G. Sirenko, I. Yu. Tkhorikov