Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
- 4 — Saint Petersburg State Mining Institute (Technical University)
Abstract
Mining systems for ore bodies of different thickness are developed for the conditions of Cholodninskoe deposit. Ration parameters of mining system are determined.
Область исследования:
(Archived) Mine survey
Funding:
None
Similar articles
Estimation methods of ore storage’s capacity for opencast startup time
2011 G. A. Kholodnyakov, M. M. Yakubovskii
Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
2011 V. V. Ivanov
Influence of a condition of a regional zone of a layer on the mechanism of occurrence of explosions of methane on collieries
2011 S. A. Tolstunov