The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
Abstract
The transformation of the stress condition of embedded border diastrophic bloc rock of the «pillar-working» system is considered, in combined action of geostatic tension, lateral and transversal tension wave, generated by rock bump. It is supposed that the tension wave front are parallel to the adjacent strata media discontinuity. Under this condition, in the article the influence of the critical tension levels on the roof and pillar rocks stress condition.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
The engineering geological control of underground transport tunnels exploitation reliability in Saint Petersburg
2011 R. E. Dashko, P. V. Kotyukov
Implementation of various failure criteria for numerical models of rock mass
2011 M. Yandris, P. A. Demenkov