The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
Abstract
The transformation of the stress condition of embedded border diastrophic bloc rock of the «pillar-working» system is considered, in combined action of geostatic tension, lateral and transversal tension wave, generated by rock bump. It is supposed that the tension wave front are parallel to the adjacent strata media discontinuity. Under this condition, in the article the influence of the critical tension levels on the roof and pillar rocks stress condition.
Область исследования:
(Archived) Geomechanics
Similar articles
Technology of «cold» briquetting of rich ores of the Jakovlevsky deposit
2011 V. L. Trushko, R. E. Dashko, V. B. Kuskov, A. S. Klyamko
Utilization of exhausted potash mines in Russia as repositories for radioactive waste disposal
2011 S. P. Mozer, O. V. Kovalev, I. Yu. Tkhorikov
Dynamic radiation control methods and instruments application peculiarities at underground points for nuclear materials storage placement, radioactive waste storages and underground nuclear thermo power plants
2011 V. G. Kondratev
Estimation methods of ore storage’s capacity for opencast startup time
2011 G. A. Kholodnyakov, M. M. Yakubovskii