The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
Abstract
The transformation of the stress condition of embedded border diastrophic bloc rock of the «pillar-working» system is considered, in combined action of geostatic tension, lateral and transversal tension wave, generated by rock bump. It is supposed that the tension wave front are parallel to the adjacent strata media discontinuity. Under this condition, in the article the influence of the critical tension levels on the roof and pillar rocks stress condition.
Область исследования:
(Archived) Geomechanics
Similar articles
Technology of kimberlitic tubes underquarry deposits mining in complex hydro-geological conditions
2011 M. N. Andreev, E. I. Boguslavskii
Geomechanical analysis of underground pillar station with step by step excavation
2011 P. A. Demenkov, M. A. Karasev, D. A. Potemkin
Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko