Submit an Article
Become a reviewer
Vol 190
Pages:
172
Download volume:
RUS
Article

The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure

Authors:
V. V. Karpenko1
Yu. N. Ogorodnikov2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-02
Date accepted:
2010-10-05
Date published:
2011-04-05

Abstract

The transformation of the stress condition of embedded border diastrophic bloc rock of the «pillar-working» system is considered, in combined action of geostatic tension, lateral and transversal tension wave, generated by rock bump. It is supposed that the tension wave front are parallel to the adjacent strata media discontinuity. Under this condition, in the article the influence of the critical tension levels on the roof and pillar rocks stress condition.

Область исследования:
(Archived) Geomechanics
Funding:

None

Go to volume 190

Similar articles

Development of strains in uniform slopes with phased mining
2011 A. M. Mochalov, A. V. Chebakov
Stress and strain state of strata before and after drainage
2011 D. N. Petrov
The choice of mining methods for the near-ore bank reserves of the Koashva deposit
2011 A. B. Koreivo, A. G. Zileev
Open cast technological system with in-pit fully mobile crushing reliability avaluation
2011 S. I. Fomin, A. A. Faul, A. I. Ponomarev
Technological advancement of gold heap leaching geotechnology with cryogenic ore desintegration
2011 S. B. Tataurov
Calculation moving and deformations used functions of typical curves, analytically expressed
2011 E. S. Rozhnov