Submit an Article
Become a reviewer
Vol 190
Pages:
172
Download volume:
RUS
Article

The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure

Authors:
V. V. Karpenko1
Yu. N. Ogorodnikov2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-02
Date accepted:
2010-10-05
Date published:
2011-04-05

Abstract

The transformation of the stress condition of embedded border diastrophic bloc rock of the «pillar-working» system is considered, in combined action of geostatic tension, lateral and transversal tension wave, generated by rock bump. It is supposed that the tension wave front are parallel to the adjacent strata media discontinuity. Under this condition, in the article the influence of the critical tension levels on the roof and pillar rocks stress condition.

Область исследования:
(Archived) Geomechanics
Go to volume 190

Similar articles

Technology of kimberlitic tubes underquarry deposits mining in complex hydro-geological conditions
2011 M. N. Andreev, E. I. Boguslavskii
Geomechanical analysis of underground pillar station with step by step excavation
2011 P. A. Demenkov, M. A. Karasev, D. A. Potemkin
Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko
Metrological maintenance mine surveying
2011 V. A. Golovanov, E. M. Volokhov, V. N. Gusev
Designing support unilateral rectangular interfase of horizontal developments
2011 Yu. N. Ogorodnikov, V. I. Ochkurov, D. N. Petrov
Qiuck-acting technique for the determination of rheological properties of rocks
2011 M. D. Ilinov, Yu. M. Kartashov