Stabilization of development workings in overworked layers
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
Abstract
Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.
Область исследования:
(Archived) Geotechnology
Similar articles
Geodinamical variability as a cause of natural disasters and technogenic catastrophes
2011 L. K. Gorshkov, Z. B. Dekusar
Implementation of various failure criteria for numerical models of rock mass
2011 M. Yandris, P. A. Demenkov
Technogenic transformation of the basic components of megacities underground space and its account in geomechanical calculations (on the example of Saint Petersburg)
2011 R. E. Dashko, A. V. Shidlovskaya, K. V. Pankratova, A. M. Zhukova