Submit an Article
Become a reviewer
Vol 190
Pages:
42
Download volume:
RUS
Article

Stabilization of development workings in overworked layers

Authors:
A. A. Sidorenko1
S. A. Sidorenko2
O. V. Trushko3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-08
Date accepted:
2010-10-16
Date published:
2011-04-05

Abstract

Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.

Область исследования:
(Archived) Geotechnology
Go to volume 190

Similar articles

Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin
Influence of a condition of a regional zone of a layer on the mechanism of occurrence of explosions of methane on collieries
2011 S. A. Tolstunov
Stress and strain state of strata before and after drainage
2011 D. N. Petrov
The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit
2011 A. G. Protosenya, D. N. Petrov, K. G. Sinyakin, G. A. Martemyanova
Estimation methods of ore storage’s capacity for opencast startup time
2011 G. A. Kholodnyakov, M. M. Yakubovskii
Calculation of displacement and deformations of rocks tunnels arising at building taking into account vertical asymmetry in distribution of displacement
2011 E. M. Volokhov, N. S. Bakh