Submit an Article
Become a reviewer
Vol 190
Pages:
42
Download volume:
RUS
Article

Stabilization of development workings in overworked layers

Authors:
A. A. Sidorenko1
S. A. Sidorenko2
O. V. Trushko3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-08
Date accepted:
2010-10-16
Date published:
2011-04-05

Abstract

Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.

Область исследования:
(Archived) Geotechnology
Funding:

None

Go to volume 190

Similar articles

Dynamic radiation control methods and instruments application peculiarities at underground points for nuclear materials storage placement, radioactive waste storages and underground nuclear thermo power plants
2011 V. G. Kondratev
The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
2011 V. V. Karpenko, Yu. N. Ogorodnikov
Assessment of safety factor for analysis of stability of boards of open-cast mines
2011 V. V. Zubkov, I. A. Zubkova
Implementation of various failure criteria for numerical models of rock mass
2011 M. Yandris, P. A. Demenkov
The method of planning of stockpiles laser scanner mine surveying
2011 E. A. Nesterenko
Method of description of air flow inside goaf of longwall with caving in underground coal mines
2011 Yan Shlonzak