Stabilization of development workings in overworked layers
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
Abstract
Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.
Область исследования:
(Archived) Geotechnology
Similar articles
Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin
The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit
2011 A. G. Protosenya, D. N. Petrov, K. G. Sinyakin, G. A. Martemyanova
A new technique for the determination of ultimate strength in extention of rocks
2011 V. A. Korshunov, Yu. M. Kartashov
Calculation moving and deformations used functions of typical curves, analytically expressed
2011 E. S. Rozhnov