Submit an Article
Become a reviewer
Vol 190
Pages:
42
Download volume:
RUS
Article

Stabilization of development workings in overworked layers

Authors:
A. A. Sidorenko1
S. A. Sidorenko2
O. V. Trushko3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-08
Date accepted:
2010-10-16
Date published:
2011-04-05

Abstract

Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.

Область исследования:
(Archived) Geotechnology
Funding:

None

Go to volume 190

Similar articles

The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit
2011 A. G. Protosenya, D. N. Petrov, K. G. Sinyakin, G. A. Martemyanova
Establishment of boundaries of hazardous zones in coal seam mining at mines of JSC «Suek-Kuzbass»
2011 N. V. Krotov, F. P. Ivchenko, A. P. Skakun, A. I. Paltsev
Development of strains in uniform slopes with phased mining
2011 A. M. Mochalov, A. V. Chebakov
Exploitational problems of the kholodninskoye polimetallik deposit mining
2011 V. P. Zubov, O. V. Mikhailenko
Account of influence of fracturing of stony and semistony rocks on the strength of rock mass in evaluation of stability of open-pit slopes by prospecting data
2011 A. M. Mochalov, S. V. Kagermazova, G. A. Grebenshchikova
Tunnel induced deformation of strata and formation of surface settlement trought during construction process
2011 M. A. Karasev