Stabilization of development workings in overworked layers
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
Abstract
Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.
Область исследования:
(Archived) Geotechnology
Funding:
None
Similar articles
Substantiation of rational mining parameters for iv potash horizon of the starobin potash deposit
2011 O. V. Kovalev, S. P. Mozer, I. Yu. Mozer, A. V. Leisle
Technological advancement of gold heap leaching geotechnology with cryogenic ore desintegration
2011 S. B. Tataurov
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov