Submit an Article
Become a reviewer
Vol 190
Pages:
42
Download volume:
RUS
Article

Stabilization of development workings in overworked layers

Authors:
A. A. Sidorenko1
S. A. Sidorenko2
O. V. Trushko3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-08
Date accepted:
2010-10-16
Date published:
2011-04-05

Abstract

Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.

Область исследования:
(Archived) Geotechnology
Go to volume 190

Similar articles

Development of strains in uniform slopes with phased mining
2011 A. M. Mochalov, A. V. Chebakov
Account of influence of fracturing of stony and semistony rocks on the strength of rock mass in evaluation of stability of open-pit slopes by prospecting data
2011 A. M. Mochalov, S. V. Kagermazova, G. A. Grebenshchikova
Connection between lumpiness and block size оf mined rock from photographs using computer processing research
2011 A. P. Sannikova
Substantiation of rational mining parameters for iv potash horizon of the starobin potash deposit
2011 O. V. Kovalev, S. P. Mozer, I. Yu. Mozer, A. V. Leisle
Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
Technological advancement of gold heap leaching geotechnology with cryogenic ore desintegration
2011 S. B. Tataurov