Submit an Article
Become a reviewer
Vol 190
Pages:
42
Download volume:
RUS
Article

Stabilization of development workings in overworked layers

Authors:
A. A. Sidorenko1
S. A. Sidorenko2
O. V. Trushko3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-08
Date accepted:
2010-10-16
Date published:
2011-04-05

Abstract

Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.

Область исследования:
(Archived) Geotechnology
Go to volume 190

Similar articles

Geodinamical variability as a cause of natural disasters and technogenic catastrophes
2011 L. K. Gorshkov, Z. B. Dekusar
The method of planning of stockpiles laser scanner mine surveying
2011 E. A. Nesterenko
Implementation of various failure criteria for numerical models of rock mass
2011 M. Yandris, P. A. Demenkov
Technogenic transformation of the basic components of megacities underground space and its account in geomechanical calculations (on the example of Saint Petersburg)
2011 R. E. Dashko, A. V. Shidlovskaya, K. V. Pankratova, A. M. Zhukova
Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
Method of description of air flow inside goaf of longwall with caving in underground coal mines
2011 Yan Shlonzak