Stabilization of development workings in overworked layers
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
Abstract
Challenges of efficient underground mining of thick flat coal seams are studied. An effective method to secure stability of site development workings in overworked layers is suggested. A conclusion is made on advisability of stress-relief workings construction in preparation of overworked layers. Parameters of slicing mining system and stress-relief workings are justified. Assessment of useful mineral loss enhancement and production cost reduction is made due to introduction of the proposed method. Possible areas are determined for application of this method.
Область исследования:
(Archived) Geotechnology
Funding:
None
Similar articles
Metal pliable support developmentsin an ore file Yakovlevsky mine
2011 V. I. Ochkurov, Yu. N. Ogorodnikov, Yu. N. Antonov
Account of influence of fracturing of stony and semistony rocks on the strength of rock mass in evaluation of stability of open-pit slopes by prospecting data
2011 A. M. Mochalov, S. V. Kagermazova, G. A. Grebenshchikova
Assessment of geodynamic and geomechanical conditions in the mining of ore bodies of near-ore bank reserves at the Koashva open-pit mine
2011 V. V. Zubkov, I. A. Zubkova, G. V. Leontev, A. G. Zileev
Thermal strengthening of loosened soils and rocks during mining operations
2011 V. A. Smirnov, E. N. Rabota, E. V. Goncharov