The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
- 4 — «Metal-groupp» Co.Ltd., «Yakovlevskiy pit»
Abstract
The methodic of the field observation for the processes of deep benchmark displacements and configuration of the local observing station is offered. The analysis of the results of the field observations for the displacements of the ore pillar is accomplished, the isolines of settling and the isolines of the average speed of settling of the ore massif is offered.
Область исследования:
(Archived) Geomechanics
Similar articles
Technological advancement of gold heap leaching geotechnology with cryogenic ore desintegration
2011 S. B. Tataurov
Providing of safe conditions for mining оf shaftbottom protective pillars in deep ore mines at Talnakh
2011 V. A. Zvezdkin, V. N. Karenin, A. G. Anokhin
The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
2011 V. V. Karpenko, Yu. N. Ogorodnikov