Submit an Article
Become a reviewer
Vol 190
Pages:
158
Download volume:
RUS

The field observation for the processes of settling of the ore ceiling caused by mining works at Yakovlevsky deposit

Authors:
A. G. Protosenya1
D. N. Petrov2
K. G. Sinyakin3
G. A. Martemyanova4
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
  • 4 — «Metal-groupp» Co.Ltd., «Yakovlevskiy pit»
Date submitted:
2010-08-28
Date accepted:
2010-10-04
Date published:
2011-04-05

Abstract

The methodic of the field observation for the processes of deep benchmark displacements and configuration of the local observing station is offered. The analysis of the results of the field observations for the displacements of the ore pillar is accomplished, the isolines of settling and the isolines of the average speed of settling of the ore massif is offered.

Go to volume 190

Similar articles

Qiuck-acting technique for the determination of rheological properties of rocks
2011 M. D. Ilinov, Yu. M. Kartashov
Metrological maintenance mine surveying
2011 V. A. Golovanov, E. M. Volokhov, V. N. Gusev
Perfection of the mine servey and geological maintenance of technology of open mountain works
2011 R. A. Takranov
Mathematical modelling of geomechanical processes at the estimation of influence of building underground constructions in cities on the undermined rock mass
2011 E. M. Volokhov, D. A. Potemkin
Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko
Establishment of boundaries of hazardous zones in coal seam mining at mines of JSC «Suek-Kuzbass»
2011 N. V. Krotov, F. P. Ivchenko, A. P. Skakun, A. I. Paltsev