Assessment of geodynamic and geomechanical conditions in the mining of ore bodies of near-ore bank reserves at the Koashva open-pit mine

Authors:
V. V. Zubkov1
I. A. Zubkova2
G. V. Leontev3
A. G. Zileev4
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
  • 4 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-25
Date accepted:
2010-10-03
Date published:
2011-04-05

Abstract

In connection with a gradual extraction of ore areas in a valley, with the aim of support of annual output of the Koashva open-pit mine, a necessity arises in involving in the mining of near-ore bank reserves, located in the north-west bench of open-pit mine. For uncovering and mining of near-ore bank reserves it is necessary to assess the geodynamic and geomechanical conditions for support of the safe mining operations. The article describes the solution of this problem by means of software product 3DEC of Itasca firm.

Go to volume 190

References

  1. Указания по безопасному ведению горных работ на месторождениях, склонных и опасных по горным ударам (Хибинские апатито-нефелиновые месторождения) / КНЦ РАН. Апатиты, 2002. 97 с.
  2. О результатах по изучению морфологии рудных тел с пересчетом запасов комплексных руд Коашвинского месторождения в 1992-2001 гг.: Отчет о НИР; Отв. исполнитель Г.Б.Иванов / ОАО «Мурманская геологоразведочная экспедиция». Апатиты, 2001. 170 с.

Similar articles

Technology of «cold» briquetting of rich ores of the Jakovlevsky deposit
2011 V. L. Trushko, R. E. Dashko, V. B. Kuskov, A. S. Klyamko
Perfection of the mine servey and geological maintenance of technology of open mountain works
2011 R. A. Takranov
Calculation of displacement and deformations of rocks tunnels arising at building taking into account vertical asymmetry in distribution of displacement
2011 E. M. Volokhov, N. S. Bakh
Establishment of boundaries of hazardous zones in coal seam mining at mines of JSC «Suek-Kuzbass»
2011 N. V. Krotov, F. P. Ivchenko, A. P. Skakun, A. I. Paltsev
The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
2011 V. V. Karpenko, Yu. N. Ogorodnikov
Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin