Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin

Authors:
S. G. Baranov1
D. S. Vlasenko2
M. A. Loginov3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — JSC «SUEK-Kuzbass»
Date submitted:
2010-08-29
Date accepted:
2010-10-18
Date published:
2011-04-05

Abstract

It was established the reciprocal interaction of longwall advance velocity, mining depth and main roof thickness per a pace of its subsidence; the proper graphs have been constructed.

Go to volume 190

References

  1. Орлов А.А. Крепление и управление кровлей в комплексно-механизированных забоях / А.А.Орлов, С.Г.Баранов, Б.К.Мышляев. М.: Недра, 1993. С.143-165.
  2. Баранов С.Г. Физическая модель взаимодействия мехкрепи с кровлей при активном управлении ею // Горное давление, горные удары и сдвижение массива; ВНИМИ. СПб, 1996. С.143-147.

Similar articles

Geomechanical analysis of underground pillar station with step by step excavation
2011 P. A. Demenkov, M. A. Karasev, D. A. Potemkin
Qiuck-acting technique for the determination of rheological properties of rocks
2011 M. D. Ilinov, Yu. M. Kartashov
Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
2011 V. A. Zvezdkin, V. N. Karelin, A. G. Anokhin, Yu. N. Nagovitsin
Technological advancement of gold heap leaching geotechnology with cryogenic ore desintegration
2011 S. B. Tataurov
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
The method of planning of stockpiles laser scanner mine surveying
2011 E. A. Nesterenko