Submit an Article
Become a reviewer
Vol 190
Pages:
133
Download volume:
RUS

Technology of «cold» briquetting of rich ores of the Jakovlevsky deposit

Authors:
V. L. Trushko1
R. E. Dashko2
V. B. Kuskov3
A. S. Klyamko4
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
  • 4 — LLC «Metall-group»
Date submitted:
2010-08-11
Date accepted:
2010-10-13
Date published:
2011-04-05

Abstract

Rich iron ores of the Jakovlevsky deposit are fine metallurgical raw materials. These ores are suitable for melt of high-quality metal at the minimum cost price as doesn't demand mineral processing. Ores contain a considerable quantity of fine classes particles and need briquetting. Mining operations include quality control of mined ore. The technology of briquetting includes, preliminary screening for removing of large classes; dispensing and preliminary mixing 85-90 % martite, iron-micaceousmartite ores and 10-15 % hydrohematite ores; mixing with connective substances; pressing; drying. The received briquettes have density 3200-3500 kg/m 3 , durability on compression 4,5 MPа.

Go to volume 190

References

  1. Патент РФ № 2292405. Способ безобжиговой переработки мелкозернистых железосодержащих отходов металлургического производства, содержащих замасленную окалину / С.А.Карпов. Опубл. 27.01.2007. Бюл. № 3.
  2. Лотош В.Е. Безобжиговое окускование руд и концентратов / В.Е.Лотош, А.И.Окунев. М.: Наука, 1980.
  3. Кожевников И.Ю. Окускование и основы металлургии / И.Ю.Кожевников, Б.М.Равич. М.: Металлургия, 1991.

Similar articles

Thermal strengthening of loosened soils and rocks during mining operations
2011 V. A. Smirnov, E. N. Rabota, E. V. Goncharov
Method of description of air flow inside goaf of longwall with caving in underground coal mines
2011 Yan Shlonzak
Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
2011 V. A. Zvezdkin, V. N. Karelin, A. G. Anokhin, Yu. N. Nagovitsin
The forecasting of stress condition in the «pillar-working» system in combined action of rock bump and geostatic pressure
2011 V. V. Karpenko, Yu. N. Ogorodnikov
Assessment of safety factor for analysis of stability of boards of open-cast mines
2011 V. V. Zubkov, I. A. Zubkova
Connection between lumpiness and block size оf mined rock from photographs using computer processing research
2011 A. P. Sannikova