Submit an Article
Become a reviewer
Vol 194
Pages:
79-83
Download volume:
RUS
Article

Technology and management of yakutian kimberlitic tubes underquarry deposits mining at difficlult hydrogeological conditions

Authors:
Vladimir S. Litvinenko1
E. I. Boguslavskii2
M. N. Andreev3
About authors
  • 1 — Ph.D., Dr.Sci. rector Saint Petersburg Mining University ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
  • 2 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2010-12-18
Date accepted:
2011-02-28
Date published:
2011-12-30

Abstract

Article is in touch with mining industry and devoted to the analysis and generalization of world experience of underground mining of kimberlitic tubes underquarry reserves. In it the urgency of research of new technologies of underground mining of kimberlitic tubes underquarry reserves in the conditions of the deposits, developed by «ALROSA». The mining technology of kimberlitic tubes water-bearing underquarry reserves excavation is described.

Область исследования:
(Archived) Current problems in geology and exploration of mineral deposits
Keywords:
kimberlitic tubes underquarry reserves method of mining water-bearing level aerodynamically connection low intensity
Go to volume 194

References

  1. Ajnbinder I.I. To a working off problem of underquarry tube reserves «Mir» in the underground way / I.I.Ajnbinder, N.P.Kramskov // Mining magazine. 2000. N 8. P.17-23.
  2. Zamesov N.F. Technical decisions on the accelerated opening and preparation for operation of underquarry reserves of «Mir» diamond tube stocks // Mining magazine. 2000. N 2. P.10-15.
  3. Kalitin V.T. The Diamond-mining complex of Russia: a current state, problems and development prospects // Mining magazine. 2003. N 1. P.110-113.
  4. Kaplunov D.R. The combined geotechnology at development of a diamondiferous deposit of a tube «Udachnaya» / M.V.Rylnikova, V.V.Kalmykov, U.А.Petrov, V.A.Suslov // Mining industry. 2005. N 4. P.21-25.
  5. Osintsev V.A. The complex of opened-underground way of working out of ore deposits with abrupt non-working boards of an open-cast mine» // Mining Magazine of High Schools News. 2005. N 3. P.34-36.

Similar articles

Experience of cross-hole electrical ip-tomography for detailed study of sulfide mineralization
2011 A. V. Vorobeva, K. V. Titov, A. E. Kaminskii, A. M. Marenko
Method of distortion’s correction of mapping electrical profiling data
2011 I. V. Zhurbin, S. E. Dogadin
Ultra wide band gpr-method: success and problems
2011 V. B. Boltintsev, V. N. Ilyakhin, K. P. Bezrodnyi
Domanikoid formations of siberian platform – kuonamskaya bituminous carbonate-shale formation
2011 V. B. Archegov
Results of application of differentially normalized electrical metod on diagonal area of Caspian sea shelf
2011 E. O. Kudryavtseva
Phased strategy of drilling manufacture re-structuring and it's economy importance
2011 E. A. Krainova