Submit an Article
Become a reviewer
Vol 195
Pages:
85-88
Download volume:
RUS
Article

Specificity technological scheme development of the stocks on mine «Yakovlevsky»

Authors:
A. A. Antonov1
M. D. Morozov2
A. S. Malyutin3
About authors
  • 1 — Ph.D. associate professor Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — student Saint Petersburg State Mining University
Date submitted:
2011-07-11
Date accepted:
2011-09-25
Date published:
2012-04-05

Abstract

The analysis of actually developed technological scheme of Jakovlevsky mine is made. The basic directions of perfection of existing technology of working off for-passes, promoting increase of capacity and decrease in costs proiz-vodstva ores are offered. The further direction of researches which will allow oprede-pour rational, a relative positioning clearing заходок in fulfilled layers and para-metres of technological schemes of joint dredging of layers is con- sidered.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
decrease in costs technological schemes joint dredging of layers
Go to volume 195

References

  1. Zubov V.P. Conception of excavation the highgrade iron ore section deposit Yakovlevsky / V.P.Zubov, A.A.Antonov // Proceedings of Mining Institute. Saint Petersburg, 2006. Vol. 168. P.203-210.
  2. Zubov V.P. Higher grade filling due to horizontal layers extraction in Yakovlevsky ore deposit / V.P.Zubov,
  3. A.A.Antonov, Yu.N.Lugovskoi, M.D.Morozov, O.V.Mikhailenko // Proceedings of Mining Institute. Saint Petersburg, 2010. Vol. 185. P.25-30.
  4. Kaplunov D.R. Strenghthening of the role of underground mining in the development of iron ore deposit / D.R.Kaplunov, A.I.Suhoruchenkov, V.A.Yukov // Mining magazine. 2006. N 4. P.52-55.

Similar articles

The technology analasys a problems оf utilization of bio- and oil slugge on enterprises fuel and energy complex
2012 K. A. Moiseeva, V. A. Rogalev
Physical and mathematical modelling of level- chamber method operational parameters at the bottom level of Gubkin mine
2012 Vladimir S. Litvinenko, E. I. Boguslavskii, P. V. Korzhavykh
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
About of an estimation of durability of the gas pipeline which is in a ground, at conducting explosive works
2012 N. L. Gorokhov, A. P. Gospodarikov
Automatic compensation of influence of stirring factors on measurement of coal bulk weight from the clearing face
2012 R. M. Proskuryakov, I. N. Voityuk, A. V. Kopteva
Rationale for choice of technological schemes of producing aggregates by open-cast mine with mobile crushing and grading complex
2012 V. V. Ivanov, A. A. Faul, A. N. Kuznetsov