Specificity technological scheme development of the stocks on mine «Yakovlevsky»

Authors:
A. A. Antonov1
M. D. Morozov2
A. S. Malyutin3
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
  • 3 — Saint Petersburg State Mining University
Date submitted:
2011-07-11
Date accepted:
2011-09-25
Date published:
2012-01-01

Abstract

The analysis of actually developed technological scheme of Jakovlevsky mine is made. The basic directions of perfection of existing technology of working off for-passes, promoting increase of capacity and decrease in costs proiz-vodstva ores are offered. The further direction of researches which will allow oprede-pour rational, a relative positioning clearing заходок in fulfilled layers and para-metres of technological schemes of joint dredging of layers is con- sidered.

Go to volume 195

References

  1. Зубов В.П. Концепция отработки Яковлевского железорудного месторождения на участках богатых железных руд / В.П.Зубов, А.А.Антонов // Записки Горного института. СПб, 2006. Т.168. С.203-210.
  2. Зубов В.П. Повышение полноты закладки выработанных пространств при слоевых системах разработки Яковлевской залежи / В.П.Зубов, А.А.Антонов, Ю.Н.Луговской, М.Д.Морозов, О.В.Михайленко // Записки Горного института. СПб, 2010. Т.185. С.25-30.
  3. Каплунов Д.Р. Усиление роли подземной добычи при разработке железорудных месторождений / Д.Р.Каплунов, А.И.Сухорученков, В.А.Юков // Горный журнал. 2006. № 4. С.52-55.

Similar articles

The designing of the constructions of the pillar underground station with applying of the low-settle building technology
2012 A. G. Protosenya, P. A. Demenkov, M. A. Karasev, N. A. Belyakov, K. P. Bezrodnyi, V. A. Maslak
Environmental monitoring of the north ecosystems exposed to an impact of the mining
2012 A. V. Strizhenok
Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva
Features land recultivation, disturbed as a result of activities of dzhidinsky mining treatment complex
2012 S. I. Fomin, E. L. Ubugunov, V. A. Shevelev
Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
2012 G. A. Kholodnyakov, K. R. Argimbaev, S. P. Reshetnyak
About of an estimation of durability of the gas pipeline which is in a ground, at conducting explosive works
2012 N. L. Gorokhov, A. P. Gospodarikov