Mining complexes dismantling technologies at extraction of flat-lying thick coal seams with unstable rocks of the roof

Authors:
G. N. Karpov
About authors
  • Saint Petersburg State Mining University
Date submitted:
2011-07-22
Date accepted:
2011-09-02
Date published:
2012-04-05

Abstract

In the given article the experience of mining complexes  dismantling at  mines  of Russia  and the United States of America is reviewed. Perspective methods of forming and lining of dismantle chambers and roof control in caving zone are  represented.

Go to volume 195

References

  1. Артемьев В.Б. Альтернативные технологии формирования демонтажных камер в условиях ОАО «СУЭК- Кузбасс» / В.Б.Артемьев, А.К.Логинов, М.Г.Лупий, С.В.Ясюченя, В.Н.Демура // Уголь. 2010. № 6.
  2. Вовк А.И. Экспериментальное крепление демонтажной камеры сталеполимерными анкерами / А.И.Вовк, А.В.Борисов, Ю.Н.Долоткин // Горный информационно- аналитический бюллетень. Неделя горняка-2003.
  3. Городилов Н.Н. Демонтаж комплекса фирмы JOY на ЗАО «Распадская» / Н.Н. Городилов, А.М.Рыжов, И.И.Волков // Горная промышленность. 2002. № 3.
  4. Городилов Н.Н. Механизация при формировании широких камер и демонтаж из них секции механизированной крепи // Горное оборудование и электромеханика. 2007. № 3.
  5. Ратохин Ю.В. Опыт перемонтажа мощного комплекса КМ-142 на шахте им. 7 ноября // Горные машины и автоматика. 2002. № 8.
  6. Speed methods of installation and dismantling while moving mining complexes from one face to another//World Mining Equipment. 1991. № 12.

Similar articles

The designing of the constructions of the pillar underground station with applying of the low-settle building technology
2012 A. G. Protosenya, P. A. Demenkov, M. A. Karasev, N. A. Belyakov, K. P. Bezrodnyi, V. A. Maslak
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
Physical and mathematical modelling of level- chamber method operational parameters at the bottom level of Gubkin mine
2012 Vladimir S. Litvinenko, E. I. Boguslavskii, P. V. Korzhavykh
Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva
Way remote magnitometrichesky control of the technical condition of the main pipelines
2012 A. N. Lyubchik
Devonian organic massif in the basins of the rivers Kara-Silovayaha (the southest Pai-Hoi)
2012 A. L. Zherlygin