Submit an Article
Become a reviewer
Vol 195
Pages:
103-107
Download volume:
RUS
Article

Mining complexes dismantling technologies at extraction of flat-lying thick coal seams with unstable rocks of the roof

Authors:
G. N. Karpov
About authors
  • post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-07-22
Date accepted:
2011-09-02
Date published:
2012-04-05

Abstract

In the given article the experience of mining complexes dismantling at mines of Russia and the United States of America is reviewed. Perspective methods of forming and lining of dismantle chambers and roof control in caving zone are represented.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
dismantle mining complex dismantle chamber safety during the mining complex dismantle
Funding:

None

Go to volume 195

References

  1. Artemiev V.B., Loginov A.K., Lupy M.G., Yasychenya S.V., Demura V.N. Alternative technologies of forming the dismantling chambers in conditions of the «SUEKKuzbass» company // Coal. 2010. N 6.
  2. Vovk A.I., Borisov A.V., Dolotkin J.N. Experimental lining of dismantle chambers with steel polymer anchors // Mining Information and Analytical Bulletin. Miner’s week2003.
  3. Gorodilov N.N., Ryzhov A.M., Volkov I.I. Dismantling of «JOY» mining complex at Raspadskaya company // Mining Industry. 2002. N 3.
  4. Gorodilov N.N. Mechanization at forming the wide chambers and dismantling the mining complexes out of them // Mining Equipment and Electromechanics. 2007. N 3.
  5. Ratokhin J.V. The experience of reinstalling of KM142 mining complex on «The 7-th of November coal mine» // Mining Machines and Automatics. 2002. N 8.
  6. Speed methods of installation and dismantling while moving mining complexes from one face to another // World Mining Equipment. 1991. N 12.

Similar articles

Test bench for experimental studies of potash ores cutting with a single cutter of mining machines
2012 V. V. Gabov, A. D. Shefner, D. I. Shishlyannikov, N. V. Chekmasov
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
Social-economic effects of forming oil and gas cluster in murmansk region
2012 A. N. Sultani
Long face ventilation performance improving in development of seam by pillarless technology
2012 V. S. Elkin
Study of engineering-geological and microbiological factors for assessing the dynamics of fracture in tunnel highway Saint Petersburg – Kiev
2012 R. E. Dashko, K. V. Pankratova, A. A. Korobko
About of an estimation of durability of the gas pipeline which is in a ground, at conducting explosive works
2012 N. L. Gorokhov, A. P. Gospodarikov