Abstract

In the given article the experience of mining complexes dismantling at mines of Russia and the United States of America is reviewed. Perspective methods of forming and lining of dismantle chambers and roof control in caving zone are represented.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
dismantle mining complex dismantle chamber safety during the mining complex dismantle
Go to volume 195

References

  1. Artemiev V.B., Loginov A.K., Lupy M.G., Yasychenya S.V., Demura V.N. Alternative technologies of forming the dismantling chambers in conditions of the «SUEKKuzbass» company // Coal. 2010. N 6.
  2. Vovk A.I., Borisov A.V., Dolotkin J.N. Experimental lining of dismantle chambers with steel polymer anchors // Mining Information and Analytical Bulletin. Miner’s week2003.
  3. Gorodilov N.N., Ryzhov A.M., Volkov I.I. Dismantling of «JOY» mining complex at Raspadskaya company // Mining Industry. 2002. N 3.
  4. Gorodilov N.N. Mechanization at forming the wide chambers and dismantling the mining complexes out of them // Mining Equipment and Electromechanics. 2007. N 3.
  5. Ratokhin J.V. The experience of reinstalling of KM142 mining complex on «The 7-th of November coal mine» // Mining Machines and Automatics. 2002. N 8.
  6. Speed methods of installation and dismantling while moving mining complexes from one face to another // World Mining Equipment. 1991. N 12.

Similar articles

Synthesis of the mechanism of the effektor of a gathering-arm loader
2012 M. A. Vasileva, A. Yu. Kuzkin, I. P. Timofeev
Test bench for experimental studies of potash ores cutting with a single cutter of mining machines
2012 V. V. Gabov, A. D. Shefner, D. I. Shishlyannikov, N. V. Chekmasov
Design features of replacement work equipment of peat excavation laoding machine
2012 D. O. Nagornov, E. A. Kremcheev
Mechanism of real option for the assessment оf risks of the investment project of offshore gas fields development
2012 M. N. Kruk
Engiineering-geological and hydrogeological problems of st. Isaak cathedral’s long-term stability substantiation (Saint-Petersburg)
2012 R. E. Dashko, A. V. Shidlovskaya, O. Yu. Aleksandrova, I. V. Alekseev
Study of engineering-geological and microbiological factors for assessing the dynamics of fracture in tunnel highway Saint Petersburg – Kiev
2012 R. E. Dashko, K. V. Pankratova, A. A. Korobko