Quality influence of grouting process for volume stress-strain condition of the soils mass near the tunnel’s face which situated in the proterozoic clays

Authors:
V. L. Trushko1
A. N. Shokov2
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
Date submitted:
2011-08-26
Date accepted:
2011-10-08
Date published:
2012-02-01

Abstract

The analysis of soils stress-strain condition for different lining including in work period retards from tunnel’s face with applying of finite-elements method is adduced. The graphical relations of stresses, displacements, soils inelastic area configuration were obtained. According to these relations final graphical relation of temporary grouting influence for permanent lining stress-strain condition was  developed.

Go to volume 196

References

  1. Протосеня А.Г. Постановка задач по расчету напряженного состояния около выработок / А.Г.Протосеня, М.О.Лебедев // Межвузовский сборник научных трудов «Устойчивость и крепление горных выработок»; СПГГИ. СПб, 1999. С.115-118.
  2. Протосеня А.Г. Определение пространственного напряженно-деформированного состояния слабого грунтового массива в призабойной части при проходке тоннеля с использованием пригруза забоя / А.Г.Протосеня, Н.А.Беляков // Записки Горного института. 2011. Т.190. С.149-163.

Similar articles

Diagnostics of potentially dangerous defects in dielectric materials
2012 E. K. Grigorev, N. S. Pshchelko
Efficient formation of the complex electrical load schedule of mining plant
2012 Ya. E. Shklyarskii, A. A. Bragin
Reconstruction of primary composition of metamorphic rocks of Amurskaya suites (Amurskii superterrane Central Asian orogenic belt)
2012 A. V. Kurguzova
Effect of potassium on the solubility of aluminum hydroxide in alkaline aluminate solutions аnd their decomposition
2012 V. N. Brichkin, E. A. Alekseeva, N. V. Nikolaeva, E. E. Gordyushenkov
Developing loading facilities with gathering-arm active action
2012 G. V. Sokolova, M. A. Vasileva, M. Yu. Nepran, S. A. Lavrenko
Simulation of mineral processing plant data
2012 N. O. Tikhonov, E. E. Andreev