Submit an Article
Become a reviewer
Vol 196
Pages:
266-270
Download volume:
RUS
Article

Developing loading facilities with gathering-arm active action

Authors:
G. V. Sokolova1
M. A. Vasileva2
M. Yu. Nepran3
S. A. Lavrenko4
About authors
  • 1 — senior lecturer Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
  • 4 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-08-13
Date accepted:
2011-10-29
Date published:
2012-05-22

Abstract

Is resulted in the article review basic designs loading parts of mining machines, analysis of physical processes of occurring at loading of rock massive is leaded with gathering-arm, basic directions of perfection of cutting heads with coupled gathering-arm are considered, and also is offered it is basic new variant of constructive execution of executive body of нагребать part for creation gathering-arm of conation.

Область исследования:
(Archived) Mining electromechanics and mining equipment
Keywords:
Loader gathering-arm firing pin rock massive freight traffic productivity
Funding:

None

Go to volume 196

References

  1. Krysachenko E.A. Research of interaction process between the operating device of the loading machine with pair heaping up legs and a pile of the lumpy bulk material: candidate of technical sciences. Novocherkassk, 1971. 22 p.
  2. Khazanovich E.Sh., Lenchenko V.V. Blast-hole drilling drifting system. Novocherkassk, 2000. 504 p.

Similar articles

Quality influence of grouting process for volume stress-strain condition of the soils mass near the tunnel’s face which situated in the proterozoic clays
2012 V. L. Trushko, A. N. Shokov
Estimation of influence of territorial conditions on market cost of the ground areas in the gardening noncommercial organisations of Leningrad region
2012 P. M. Snytko
Concerning the possibility of an effective hadfield's steel cold-work hardening in the working conditions of the lining of spherical mills
2012 V. S. Bochkov, V. I. Bolobov, A. P. Batalov, Yu. P. Boitsov
Kholodninskoe deposit: development strategy, main engineering solutions, perspective exploration
2012 Vladimir S. Litvinenko, V. P. Zubov, O. V. Mikhailenko
The balanced scorecard as the tool оf the realization of the company’s strategy (on example iron-ore companies)
2012 T. A. Pikalova, T. V. Ponomarenko
Economic efficiency of using innovation technologies in underground gas storage facilities
2012 G. S. Elizarova