Developing loading facilities with gathering-arm active action
About authors
- 1 — senior lecturer Saint Petersburg State Mining University
- 2 — post-graduate student Saint Petersburg State Mining University
- 3 — post-graduate student Saint Petersburg State Mining University
- 4 — post-graduate student Saint Petersburg State Mining University
Abstract
Is resulted in the article review basic designs loading parts of mining machines, analysis of physical processes of occurring at loading of rock massive is leaded with gathering-arm, basic directions of perfection of cutting heads with coupled gathering-arm are considered, and also is offered it is basic new variant of constructive execution of executive body of нагребать part for creation gathering-arm of conation.
Область исследования:
(Archived) Mining electromechanics and mining equipment
References
- Krysachenko E.A. Research of interaction process between the operating device of the loading machine with pair heaping up legs and a pile of the lumpy bulk material: candidate of technical sciences. Novocherkassk, 1971. 22 p.
- Khazanovich E.Sh., Lenchenko V.V. Blast-hole drilling drifting system. Novocherkassk, 2000. 504 p.
Similar articles
Substantiation of schemes of the electrical supply of remote areas of oil extracting
2012 D. A. Ustinov, A. V. Turysheva, I. G. Plotnikov
The fuzzy logic approach to an estimation of competitiveness of mountain production
2012 K. A. Gafarova, Tatiana V. Ponomarenko