Modern instruments of quantitative risk analysis and risk assessment of innovation projects
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
- 2 — post-graduate student National Mineral Resources University (University of Mines)
- 3 — Ph.D., Dr.Sci. professor Saint Petersburg State Forestry Engineering University
Abstract
The detailed analysis of quantitative methods of innovation projects’ risk assessment is made, the advantages and limits of several methods are shown. The possibilities of usage of the most modern methods of risk assessment, including real options method and method of multivariate fuzzy analysis, are characterized.
Область исследования:
(Archived) Economic problems and prospects of mineral and raw material sector of Russia
Keywords:
quantitative risk assessment
probabilistic analysis
expert assessment
sensitivity analysis
gaming simulation
simulation modelling
multivariate fuzzy analysis
real options method
References
- Vilenskiy P.L., Livshiz V.N., Smoliak S.A. The assessment of investment projects efficiency. Theory and practice. Moscow, 2004 .
- Gracheva M.V. Risk management in innovation activities / M.V. Gracheva, S.U.Liapina. Moscow, 2010 .
- Derevianko P.M. The comparison of fuzzy and simulation modelling approach to the modelling of enterprise activity under conditions of uncertainty // Modern problems of economics and management of national economy. Saint Petersburg, 2005. Rel.14.
- Sergeev V.A. The foundations of innovation projecting: educational guidance / V.A.Ser geev, E.V.Kipcharskaya, D.K. Podimalo: Edit. by V.A.Sergeev. Ul ianovsk, 2006.
- Trubacheev E.V. The strategy of investment. Educationa l course. Moscow, 2010.
- Chernih E. Innovations as real options or planning of the unpredictable // Quality management. 2008. No 3
Similar articles
Diagnostics of continuous technological process based on fuzzy topological identification
2012 M. Yu. Shestopalov, Yu. A. Korablev
Engineering-geological ensuring for safety of mining work in water-inundated solid mass
2012 N. A. Kutepova, Yu. I. Kutepov, A. N. Shabarov
Stress state of entries support when stocks of ore mine Vostochny are developing by combined open-pit and underground method
2012 A. G. Protosenya, A. D. Kuranov