Analysis of robust capacity wells of foamed cements
Authors:
About authors
- Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
Abstract
Evaluated conditions reliable capacity wells foamed cements in pavements, rock and a current analysis of the temperature field of concrete pavements rocks with varying temperature, which allowed to establish conditions of reliable fastening of wells and the effective application of these foamed cements do not require special technological receptions for drilling of concrete pavements.
Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Funding:
None
References
- GrjaznovG.S. Features of deep drilling of chinks in areas of the eternal froze breeds. Мoscow, 1969.
- KudryashovB.B., Yakovlev A.M. Dril ling of chinks in frozen breeds. Мoscow, 1983.
- MedvedovskyR.I. Building and operation of chinks on oil and gas in vech-nomerzlyh breeds. Мoscow, 1987.
- YakovlevA.A. Foamed and foamed cements (a complex th technology of drilling and fastening of chinks) / Saint Petersburg, 2000.
- MontmanR., Sutton D.L. Foamed portland cements / R.Montman, D.L.Sutton // Oil and Gas J. 1983. Vol. 89. No 20.
- RozieresS.D. Foamed cements characterization under downhole conditions and I-bz i mpact on job design // SPE Prog. Eng. 1991. Vol.3.
Similar articles
Structural approach to complex dynamic object fault detection and localization
2012 L. B. Poshekhonov, M. Yu. Shestopalov
Acceptable risk assessment of production in mining industry
2012 A. N. Shabarov, G. I. Korshunov, E. G. Buldakova, Z. N. Cherkai
Geological risks insurance as an element оf the organizational and economic mechanism of increasing investment attractiveness оf the russian mineral resources base of scarce minerals reproduction process
2012 N. V. Pashkevich, V. S. Khloponina
Assessment of groundwater limitations in the context of Saint-Petersburg territory development
2012 V. V. Antonov