Wells drilling with hydrotransport of drill core
About authors
- 1 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
- 2 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
Abstract
The work is devoted to development and new technology hydraulic transport drill core of drill-hole returns on Buryatgold deposites. Scheme and basis parameters of drilling are given.
Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Funding:
None
Similar articles
Rationale for the development of the method of existing iron typetailing gully
2012 V. I. Ekgardt, V. V. Kvitka, G. A. Kholodnyakov, K. R. Argimbaev
PRediction of spatial stress-strain double-track tunnels Frunzensky radius Saint Petersburg underground
2012 A. G. Protosenya, I. K. Suprun
Deep open pit walls design using rock mass stress-strained state
2012 S. P. Reshetnyak, Yu. V. Fedotova, S. N. Savchenko
Mathematical model of the distribution оf temperature in the hole and the surrounding mountain range when applying foamed cements
2012 A. A. Yakovlev