Article

Wells drilling with hydrotransport of drill core

Authors:
Yu. E. Budyukov1
V. I. Spirin2
About authors
  • 1 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
  • 2 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
Date submitted:
2011-09-19
Date accepted:
2011-11-20
Date published:
2012-05-25

Abstract

The work is devoted to development and new technology hydraulic transport drill core of drill-hole returns on Buryatgold deposites. Scheme and basis parameters of drilling are given.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
drilling drill pipe diamond bit drill core upflow drill rate solid phase
Funding:

None

Go to volume 197

Similar articles

Rationale for the development of the method of existing iron typetailing gully
2012 V. I. Ekgardt, V. V. Kvitka, G. A. Kholodnyakov, K. R. Argimbaev
PRediction of spatial stress-strain double-track tunnels Frunzensky radius Saint Petersburg underground
2012 A. G. Protosenya, I. K. Suprun
Deep open pit walls design using rock mass stress-strained state
2012 S. P. Reshetnyak, Yu. V. Fedotova, S. N. Savchenko
Mathematical model of the distribution оf temperature in the hole and the surrounding mountain range when applying foamed cements
2012 A. A. Yakovlev
Legitimacies of flushing method formation by mechanically in the conditions of long-term frozen grounds
2012 S. A. Tolstunov, A. V. Montikov
Main problems of new generation open pit mines design
2012 S. P. Reshetnyak