Submit an Article
Become a reviewer
Vol 197
Pages:
68-70
Download volume:
RUS
Article

Wells drilling with hydrotransport of drill core

Authors:
Yu. E. Budyukov1
V. I. Spirin2
About authors
  • 1 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
  • 2 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
Date submitted:
2011-09-19
Date accepted:
2011-11-20
Date published:
2012-05-25

Abstract

The work is devoted to development and new technology hydraulic transport drill core of drill-hole returns on Buryatgold deposites. Scheme and basis parameters of drilling are given.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
drilling drill pipe diamond bit drill core upflow drill rate solid phase
Funding:

None

Go to volume 197

Similar articles

Commercialization of results of scientific researches and development as factor of innovative development of economy
2012 V. A. Knysh
Technical equipments for realization investigation works on shelf of arctic seas
2012 V. P. Onishchin
Assessment of groundwater limitations in the context of Saint-Petersburg territory development
2012 V. V. Antonov
The method of contact zone ore-waste rock optimum development
2012 V. V. Kvitka, S. I. Fomin, P. B. Kava
Development of principles of construction and operation of new diamond bits
2012 L. K. Gorshkov, A. I. Osetskii
Crystallization of calcium in the hydrocarboaluminates in the system CaCO3 – Na2O – Al2O3 – H2O
2012 V. M. Sizyakov, E. V. Sizyakova, E. S. Kononenko