Drilling of deep geological prospecting wells in Norilsk region
About authors
- 1 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
- 2 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
- 3 — Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
Abstract
Algorithm of projecting of deep wells construction, based on analysis of drilling of first deep wells in Norilsk region is composed. Article shows, that usage of new diamond bits improve efficiency of drilling.
Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
References
- Buchkovsky E.V., Budykov Y.E., Vlasyuk V.I., Spirin V.I., Solovyov N.V. New highly effective diamond rock cutting tool. In compilation «Priority directions of development of science and technologies»: reports of IX all-Russian scientific technical conference: under recension of prof. E.M. Sokolova. Tula, 2007.
- Onischin V.P. Determination of time costs during drilling with removable rock cutting tool. In compilation «The rock cutting and metal-working instrument – engineer-ing and technology of its manufacture and application» – Vol . 13, – Kiev, ISM name of V.N. Bakulya, NAS of Ukraine, 2010. P. 20- 25.
- Budykov Y.E., Vlasyuk V.I., Spirin V.I. Diamond tools during drilling of direction and multi-barreled wells. – Tula: Grif & K, 2007. 176 p.
Similar articles
Diagnostics of continuous technological process based on fuzzy topological identification
2012 M. Yu. Shestopalov, Yu. A. Korablev
Mathematical model of the distribution оf temperature in the hole and the surrounding mountain range when applying foamed cements
2012 A. A. Yakovlev
Acceptable risk assessment of production in mining industry
2012 A. N. Shabarov, G. I. Korshunov, E. G. Buldakova, Z. N. Cherkai
The method of contact zone ore-waste rock optimum development
2012 V. V. Kvitka, S. I. Fomin, P. B. Kava