Designing of complex mining operations in coal mines

Authors:
O. V. Kovalev1
S. P. Mozer2
I. Yu. Tkhorikov3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 3 — Ph.D. research assistant National Mineral Resources University (Mining University)
Date submitted:
2011-10-19
Date accepted:
2011-12-13
Date published:
2012-11-19

Abstract

The basic laws of gas filtration at different stages of coal deposit mining are considered. The technique used for studying complex development of power resources of coal deposits, allowing with reference to concrete conditions to receive engineering dependences for a quantitative estimation of all key parametres of investigated processes is given. On the basis of the developed approach to complex development the algorithm of the practical solution of the problem is offered.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
gas filtration coal deposit engineering dependences algorithm of the practical solution of a problem
Funding:

None

Go to volume 198

References

  1. Mozer S.P., Kurtukov E.B. Rock mechanics: basic physics and mechanism of occurrence of geomechanical processes in underground mining / Saint Petersburg: Nedra, 2009.136 p.
  2. Petrenko E.V. Development of innovative activity in Russia coal branch // Ugol. 2006. No 1. Р.30- 34.
  3. Puchkov L.A., Slastunov S.V. Decision of problems of coal methane: methane-safety, an industrial gas produc-tion, ecology // Ugol . 2005. No 5. Р . 5-7.

Similar articles

Provision of geodynamic safety in mining the Barentsburg coal deposit
2012 M. V. Shvankin, M. A. Rozenbaum, Yu. Ya. Minin, V. P. Stetsenko, A. V. Bondarev
Mechanizаtion of steep thick coal seams working
2012 L. F. Kozhukhov, K. V. Struk
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
Blasting charge diameter influence on the blasting efficiency
2012 Yu. I. Vinogradov, V. A. Artemov
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
Particularities of gold ore deposit development in complex environment
2012 V. A. Bakhtin, L. I. Boguslavskaya, S. V. Kiryukov, E. N. Kozlov, T. A. Prolomova, A. D. Fomenko