Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
- 3 — Petersburg State Transport University
- 4 — Petersburg State Transport University
- 5 — Petersburg State Transport University
- 6 — Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Similar articles
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin
Development of the composition and technology for industrial production of an emulsifier used in oil рroduction for inverse water-in-oil emulsions
2012 N. K. Kondrasheva, M. K. Rogachev
Perspectives of further development of technics and technology of shafts building in Russia with consideration of world technologies
2012 V. A. Kurnakov, M. S. Pleshakov
The prediction technics of tunnel sets with complex three dimensional configuration stress state with allowance for relative influence and building sequence
2012 A. G. Protosenya, N. A. Belyakov, A. D. Kuranov