Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
- 3 — Petersburg State Transport University
- 4 — Petersburg State Transport University
- 5 — Petersburg State Transport University
- 6 — Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Similar articles
Algorithm and characterization program of downhole electrosteamgenerator for heat treatment on high viscosity oil recervoirs
2012 E .A. Zagrivnyi, V. O. Zyrin
Definition of area harmful interference in communications construction underground
2012 M. G. Mustafin, A. S. Naumov
Formation and development of mining-and-geological processes in relation to changes in engineering-geological and hydrogeological conditions on Yakovlevsky mine
2012 R. E. Dashko, E. N. Feller