Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
- 3 — Petersburg State Transport University
- 4 — Petersburg State Transport University
- 5 — Petersburg State Transport University
- 6 — Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Similar articles
Development of the composition and technology for industrial production of an emulsifier used in oil рroduction for inverse water-in-oil emulsions
2012 N. K. Kondrasheva, M. K. Rogachev
Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Standard and methodical support of estimation of adverse effect of underground construction and monitoring of deformations for conditions of Saint-Petersburg
2012 E. M. Volokhov, S. N. Zelentsov, V. P. Khutskii
Method for determining the vertical and strain displacement using laser-scanning systems
2012 V. N. Gusev, M. G. Vystrchil