Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
- 3 — Petersburg State Transport University
- 4 — Petersburg State Transport University
- 5 — Petersburg State Transport University
- 6 — Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Similar articles
Modern monitoring systems of displacements and deformations at building of underground constructions
2012 E. M. Volokhov, S. Yu. Novozhenin, Nguen Suan Bak
Безопасные параметры сдвижения земной поверхности при строительстве метрополитена в Санкт-Петербурге
2012 V. P. Khutskii
About the necessity of accounting of geodinamically active fractures zones in cadastral valuation оf settlement earths
2012 V. A. Kiselev, O. A. Tributs
Physical modeling during scientific following of subway structures underground construction in condition of Saint Petersburg
2012 Yu. S. Frolov, A. N. Konkov, A. A. Larionov