Submit an Article
Become a reviewer
Vol 199
Pages:
161-167
Download volume:
RUS
Article

Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope

Authors:
M. O. Lebedev
About authors
  • Ph.D. laboratory head «Lenmetrogiprotrans» OJSC
Date submitted:
2011-11-03
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

The paper presents the results of field observations on formation of stressed state in shotcrete temporary tunnel support when constructing a traffic tunnel of NCRW near the slope. Numerical simulation of stressed deformed state of the «support – block» system has been accomplished for the considered engineering geological conditions. The results obtained point to a possibility of developing the procedure of calculating supports based on results of field observations under comparable conditions in combination with SDS modeling applying finite-element method adapted for specific conditions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
tunnel’s support-block stresses slope
Go to volume 199

References

  1. Numerical modeling of temporary and permanent tunnel lining – soil interaction / A.G.Protosenia, R.I.Larionov, K.P.Bez rodny, V.A.Maslak, M.O.Lebedev // Proceedings of Tula State University. Seires «Earth Science». Tula, 2009. Vol.4.

Similar articles

Substantiating of plasma-pulse technology use to increase oil recovery on high-viscosity oil fields
2012 A. A. Molchanov, I. E. Dolgii, A. V. Kozlov
On cosmic rotation-pulsatory cycles of the earth and the natural-technogeneous status of objects in underground space under conditions of geodynamic instability and solar depression in 1982-2065
2012 B. G. Tarasov, E. K. Melnikov, L. V. Bugaenko
Experience of works on the waterproofing of underground constructions
2012 V. M. Dianov, A. V. Savich, K. S. Pashin, S. A. Grafkin
Allocation of areas under the coal-mining industry
2012 E. N. Bykova
Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine
2012 A. G. Protosenya, A. D. Kuranov, A. N. Shokov
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov