Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope

Authors:
M. O. Lebedev
About authors
  • Ph.D. laboratory head «Lenmetrogiprotrans» OJSC
Date submitted:
2011-11-03
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

The paper presents the results of field observations on formation of stressed state in shotcrete temporary tunnel support when constructing a traffic tunnel of NCRW near the slope. Numerical simulation of stressed deformed state of the «support – block» system has been accomplished for the considered engineering geological conditions. The results obtained point to a possibility of developing the procedure of calculating supports based on results of field observations under comparable conditions in combination with SDS modeling applying finite-element method adapted for specific conditions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
tunnel’s support-block stresses slope
Funding:

None

Go to volume 199

References

  1. Numerical modeling of temporary and permanent tunnel lining – soil interaction / A.G.Protosenia, R.I.Larionov, K.P.Bez rodny, V.A.Maslak, M.O.Lebedev // Proceedings of Tula State University. Seires «Earth Science». Tula, 2009. Vol.4.

Similar articles

Stress and strain state of «soil – pile foundations» for varios stages of high-rise building construction
2012 D. A. Potemkin, P. A. Demenkov, V. N. Ochnev, A. D. Kuranov
Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
Numerical modeling of tunnel yield element behaviour
2012 M. A. Karasev, N. A. Belyakov
Features of pumping of the liquefied hydrocarbonic gases on pipelines
2012 E. I. Krapivskii, O. F. Putikov, V. M. Pisarevskii
Calculation of parameters of new method of repair of making
2012 N. N. Kasyan, I. G. Sakhno, A. O. Novikov, N. A. Ovcharenko
Formation and development of mining-and-geological processes in relation to changes in engineering-geological and hydrogeological conditions on Yakovlevsky mine
2012 R. E. Dashko, E. N. Feller