Submit an Article
Become a reviewer
Vol 199
Pages:
161-167
Download volume:
RUS
Article

Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope

Authors:
M. O. Lebedev
About authors
  • Ph.D. laboratory head «Lenmetrogiprotrans» OJSC
Date submitted:
2011-11-03
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

The paper presents the results of field observations on formation of stressed state in shotcrete temporary tunnel support when constructing a traffic tunnel of NCRW near the slope. Numerical simulation of stressed deformed state of the «support – block» system has been accomplished for the considered engineering geological conditions. The results obtained point to a possibility of developing the procedure of calculating supports based on results of field observations under comparable conditions in combination with SDS modeling applying finite-element method adapted for specific conditions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
tunnel’s support-block stresses slope
Funding:

None

Go to volume 199

References

  1. Numerical modeling of temporary and permanent tunnel lining – soil interaction / A.G.Protosenia, R.I.Larionov, K.P.Bez rodny, V.A.Maslak, M.O.Lebedev // Proceedings of Tula State University. Seires «Earth Science». Tula, 2009. Vol.4.

Similar articles

Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
Prediction of the mine working stability in the massif which are crossing zone of weakening
2012 M. G. Popov
Geometric features of rounded crystals
2012 A. I. Glazov
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov
Numerical modeling of tunnel yield element behaviour
2012 M. A. Karasev, N. A. Belyakov
Changes in strain and slope geostructural block in the preparation and realization of technogenic eathquake
2012 A. A. Kozyrev, M. M. Kagan, K. N. Konstantinov, D. V. Zhirov