About the problem of shafts projecting and building in the conditions of modern market relations
About authors
- 1 — Ph.D., Dr.Sci. professor STC «Science and Practice»
- 2 — Ph.D. associate professor Shakhty Institute (BRANCH) of Southe Russian State Technical University (Novocherkassk Polytechnic Institute)
- 3 — Ph.D., Dr.Sci. associate professor Shakhty Institute (BRANCH) of Southe Russian State Technical University (Novocherkassk Polytechnic Institute)
Abstract
Comparative analysis of home and foreign experience of shaft building is fulfilled. Conclusion about perspectiveness of unification of educational, scientific – research and building organizations is made. Concrete examples of cooperation are given.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Building norms and Rules II-94-80. Underground Mining Working Out. Moscow, 1982. 31 p.
Similar articles
Rationale for assessing the degree of fracturing rock mass by gpr based on mathematical modeling
2012 V. V. Glazunov, S. M. Danilev
Calculation of parameters of new method of repair of making
2012 N. N. Kasyan, I. G. Sakhno, A. O. Novikov, N. A. Ovcharenko
Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine
2012 A. G. Protosenya, A. D. Kuranov, A. N. Shokov
On cosmic rotation-pulsatory cycles of the earth and the natural-technogeneous status of objects in underground space under conditions of geodynamic instability and solar depression in 1982-2065
2012 B. G. Tarasov, E. K. Melnikov, L. V. Bugaenko