Submit an Article
Become a reviewer
Vol 204
Pages:
276-283
Download volume:
RUS
Article

Development of geomechanical provision room-and-pillar system of rock burst ore deposits at great depths

Authors:
D. V. Sidorov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2012-11-27
Date accepted:
2013-01-03
Date published:
2013-11-18

Abstract

Considered directions of geomechanical provide room-and-pillar system rock burst ore deposits at great depths, consisting in the modernization and development of the scientific basis of the complex methods for determining the allowable size of worked-out areas, the size of the roof chamber, the size a protective of the pillars, the size of the chamber – pillars, including with regard to their dynamic burst, and creating automated software system for long-term forecasting of the geodynamic state of the ore deposit and shockproof advance planning of activities to improve the safety of mining operations.

Область исследования:
(Archived) Mining geomechanics
Keywords:
geomechanical provision room and pillar system rock burst ore deposit
Go to volume 204

Similar articles

Analysis of dissemination of surface deformation at open pit mining
2013 V. V. Budilova, A. A. Pavlovich, D. A. Ikonnikov
Automation of architecture and urban-planning authority as the basis of strategic planning
2013 P. P. Spirin, E. B. Bejaeva, V. F. Kovyazin, E. D. Asetskaya
Application of terrestrial laser scanning for creation of three-dimensional models of Shukhov tower
2013 V. A. Valkov, M. G. Mustafin, G. V. Makarov
Formation of technical areas rock burst in the coal seam
2013 M. G. Mustafin
Modelling of process of liquidation of underground emptinesses in the conditions of technogenic activation
2013 A. A. Shubin
Information system of town planning activities based on PTC SOTO
2013 M. E. Skachkova