Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane

Authors:
V. G. Potjuchliaev1
G. I. Khudiakov2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
Date submitted:
2012-11-15
Date accepted:
2013-01-13
Date published:
2013-11-18

Abstract

Presents the results of full-scale observation of the state of rail crane tracks in the period of their operation. It is established, that at a geodetic control of a craft of the crane equipment, special attention should be paid to the bridge cranes and the status of crane rails in the plan.

Область исследования:
(Archived) Engineering geodesy
Keywords:
crane rails overhead crane geodetic control
Go to volume 204

References

  1. A.s. 734502 USSR. (51) M. Kl.² G 01 B 11/24. Device for control of non flatness / N.A.Gusev, V.G. Potjuchliaev. From 1980. Bull. No 18.
  2. Donscich I.E. Rang method of measuring the displacement of structures. Moscow: Nedra, 1974. 192 p.
  3. Potjuchliaev V.G., Shalygin M.V. On the organization of the geodesic maintenance shop of the crane equipment // Mine surveying and geodesy / Leningrad Mining Institute. Leningrad, 1987. P.47-51.
  4. Rules of arrangement and safe operation of loadlifting cranes. Moscow: Metallurgy, 1973. 193 p.
  5. Rumshisciy L.Z. Elements of the theory of probability. Moscow: Nauka, 1976. 240 p.
  6. Sytnik V.S. Construction geodesy. Moscow: Nedra, 1974. 136 p.

Similar articles

Formation of technical areas rock burst in the coal seam
2013 M. G. Mustafin
Possibility of using spline surfaces for surface plotting by results of surveying
2013 E. A. Nesterenko
High technology of underground construction in mega-cities with dense urban
2013 M. G. Popov
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Rationale for the accuracy and parameters of cadastral surveying of land urbanized territories
2013 M. Ya. Bryn, P. A. Veselkin, V. N. Ivanov, A. V. Astapovich, J. V. Shcherbak
Limitations management of land resources is based on information support for state real estate cadastre
2013 V. A. Kiselev, A. G. Shabaev