Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
About authors
- 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
- 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
Abstract
Presents the results of full-scale observation of the state of rail crane tracks in the period of their operation. It is established, that at a geodetic control of a craft of the crane equipment, special attention should be paid to the bridge cranes and the status of crane rails in the plan.
Область исследования:
(Archived) Engineering geodesy
References
- A.s. 734502 USSR. (51) M. Kl.² G 01 B 11/24. Device for control of non flatness / N.A.Gusev, V.G. Potjuchliaev. From 1980. Bull. No 18.
- Donscich I.E. Rang method of measuring the displacement of structures. Moscow: Nedra, 1974. 192 p.
- Potjuchliaev V.G., Shalygin M.V. On the organization of the geodesic maintenance shop of the crane equipment // Mine surveying and geodesy / Leningrad Mining Institute. Leningrad, 1987. P.47-51.
- Rules of arrangement and safe operation of loadlifting cranes. Moscow: Metallurgy, 1973. 193 p.
- Rumshisciy L.Z. Elements of the theory of probability. Moscow: Nauka, 1976. 240 p.
- Sytnik V.S. Construction geodesy. Moscow: Nedra, 1974. 136 p.
Similar articles
Ultrasonic study of creep in polycrystalline rocks
2013 V. M. Tsaplev, R. M. Ivanyuk, V. V. Zverevich
Application of high-precision methods of laser scanning at creation of the detailed digital copies of objects
2013 V. V. Kulesh, G. I. Khudiakov