Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
About authors
- 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
- 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
Abstract
Presents the results of full-scale observation of the state of rail crane tracks in the period of their operation. It is established, that at a geodetic control of a craft of the crane equipment, special attention should be paid to the bridge cranes and the status of crane rails in the plan.
Область исследования:
(Archived) Engineering geodesy
Funding:
None
References
- A.s. 734502 USSR. (51) M. Kl.² G 01 B 11/24. Device for control of non flatness / N.A.Gusev, V.G. Potjuchliaev. From 1980. Bull. No 18.
- Donscich I.E. Rang method of measuring the displacement of structures. Moscow: Nedra, 1974. 192 p.
- Potjuchliaev V.G., Shalygin M.V. On the organization of the geodesic maintenance shop of the crane equipment // Mine surveying and geodesy / Leningrad Mining Institute. Leningrad, 1987. P.47-51.
- Rules of arrangement and safe operation of loadlifting cranes. Moscow: Metallurgy, 1973. 193 p.
- Rumshisciy L.Z. Elements of the theory of probability. Moscow: Nauka, 1976. 240 p.
- Sytnik V.S. Construction geodesy. Moscow: Nedra, 1974. 136 p.
Similar articles
The method of geodetic measurument of Saint Nicholas Naval сathedral deformation in the town of Kronstadt
2013 O. S. Stepanova, G. V. Makarov
Influence percentage value common land on a property on market value of land gardening noncommercial organizations Leningrad’s region
2013 P. M. Demidova, V. G. Gorelikov