Submit an Article
Become a reviewer
Vol 204
Pages:
154-162
Download volume:
RUS
Article

Automation of architecture and urban-planning authority as the basis of strategic planning

Authors:
P. P. Spirin1
E. B. Bejaeva2
V. F. Kovyazin3
E. D. Asetskaya4
About authors
  • 1 — Ph.D. chief OGP OJSC NIIPGradostroitelstva
  • 2 — Ph.D. Ltd «Laboratoriya SOTO»
  • 3 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 4 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2012-11-26
Date accepted:
2013-01-28
Date published:
2013-11-18

Abstract

The article raises issues of automation of architecture and urban-planning authority in municipalities and regions of the Russian Federation, the creation and maintenance of information system of urban-planning activities, indicates the problems and principles of their solutions from the standpoint of effective management of the information space of the territories on the basis of urban-planning documents of different levels.

Область исследования:
(Archived) Land surveying and urban cadastre
Keywords:
information system urban-planning
Funding:

None

Go to volume 204

References

  1. Russian Federation Urban-planning code. Moscow: Prospect. KnoRus. 2011. 144.
  2. About information system of urban-planning activities. The resolution of the Russian Federation Government of 09.06.2006. N 363. Art. 2725 // Collection of Russian Federation acts. 2006. N 25.
  3. About the approval of documents on maintaining information system of urban-planning activities: Order of the Russian Federation Regional Development Ministry of 30.08.2007. N 85 // Bulletin of regulations of federal executive authorities. 2008. N 9.
  4. About the statement of the Order of inventory and transfer to information system of urban-planning activities of authority in municipalities of data on documents and materials of development of territories and other data which are necessary for urban-planning activity containing in documents, accepted by authority in municipalities. Order of the Russian Federation Regional Development Ministry of 30.08.2007 N 86 // Bulletin of regulations of federal executive authorities. 2007. N 51.

Similar articles

Influence condition of ground on complexity in the process open pit Kuzbas`s coal deposits
2013 R. A. Takranov, A. A. Litvinova
Problems of small and medium Russian towns residential development cadastral valuation
2013 O. Y. Lepikhina, V. G. Gorelikov
Application of high-precision methods of laser scanning at creation of the detailed digital copies of objects
2013 V. V. Kulesh, G. I. Khudiakov
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Assessment of the degree of disturbance of the undermined strata by technogenic water conducting fractures according to geomechanical monitoring in the excavations of Yakovlevski mine
2013 V. N. Gusev, D. A. Ilukhin, A. E. Zhuravlev
Modelling of process of liquidation of underground emptinesses in the conditions of technogenic activation
2013 A. A. Shubin