Modelling stressedly-deformed condition of the soil massif including elements of the multipurpose facility with multystoried underground part

Authors:
P. A. Demenkov1
D. A. Potyomkin2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2012-11-26
Date accepted:
2013-01-05
Date published:
2013-11-18

Abstract

In work the option of the multipurpose underground complex being part of the multystoried high-rise building is considered. The complex settles down in underground part of the building and carries out a base role, replacing with itself the usual plates-but-pile base. Predesigns by a method of final elements taking into account staging of construction of an underground complex and the land high-rise building are executed. Sizes and a picture of distribution of vertical displacements are received as a result of calculations.

Область исследования:
(Archived) Mining geomechanics
Keywords:
multifunctional underground facility foundation finite element method settling displacement
Go to volume 204

References

  1. MDS 50-1. Design and device of the bases, bases and underground parts of multipurpose high-rise buildings and complexes / Federal State Unitary Enterprise Research Center «Stroitelstvo». Moscow, 2007.
  2. Guide to complex development of underground space of the large cities. Moscow, 2004.

Similar articles

The method of geodetic measurument of Saint Nicholas Naval сathedral deformation in the town of Kronstadt
2013 O. S. Stepanova, G. V. Makarov
Limitations management of land resources is based on information support for state real estate cadastre
2013 V. A. Kiselev, A. G. Shabaev
Analysis of dissemination of surface deformation at open pit mining
2013 V. V. Budilova, A. A. Pavlovich, D. A. Ikonnikov
Development of land relations in the Vyborg district, Leningrad region in 1944-2012 years
2013 P. S. Tukalenko, V. F. Kovyazin
The prediction of underopencast rock mass stress- strain condition during surface-underground development of Koashva deposit
2013 A. G. Protosenya, A. N. Shokov
Optional distances between cylinder reflectors and laser scanning system
2013 M. G. Vystrchil