Modelling stressedly-deformed condition of the soil massif including elements of the multipurpose facility with multystoried underground part

Authors:
P. A. Demenkov1
D. A. Potyomkin2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2012-11-26
Date accepted:
2013-01-05
Date published:
2013-11-18

Abstract

In work the option of the multipurpose underground complex being part of the multystoried high-rise building is considered. The complex settles down in underground part of the building and carries out a base role, replacing with itself the usual plates-but-pile base. Predesigns by a method of final elements taking into account staging of construction of an underground complex and the land high-rise building are executed. Sizes and a picture of distribution of vertical displacements are received as a result of calculations.

Область исследования:
(Archived) Mining geomechanics
Keywords:
multifunctional underground facility foundation finite element method settling displacement
Funding:

None

Go to volume 204

References

  1. MDS 50-1. Design and device of the bases, bases and underground parts of multipurpose high-rise buildings and complexes / Federal State Unitary Enterprise Research Center «Stroitelstvo». Moscow, 2007.
  2. Guide to complex development of underground space of the large cities. Moscow, 2004.

Similar articles

Influence percentage value common land on a property on market value of land gardening noncommercial organizations Leningrad’s region
2013 P. M. Demidova, V. G. Gorelikov
Connection content and properties of coal for quality control and quantity of coal-mining
2013 R. A. Takranov
Geomechanical analysis of surface settlement trough development due to construction of deep underground pillar station
2013 P. A. Demenkov
Application of terrestrial laser scanning for creation of three-dimensional models of Shukhov tower
2013 V. A. Valkov, M. G. Mustafin, G. V. Makarov
Determining of the parameters of water conducting fracture zone through values of underminen strata horizontal deformations values
2013 V. N. Gusev, D. A. Ilukhin, A. G. Aleksenko
Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potjuchliaev, G. I. Khudiakov