Geomechanical analysis of surface settlement trough development due to construction of deep underground pillar station
Authors:
About authors
- Ph.D. associate professor National Mineral Resources University (Mining University)
Abstract
Geomechanical analysis of surface subsidence development due to construction of deep underground station is presented. The station is a typical pylon structure, which is usually used during construction of the latest subway station in Saint Petersburg. Numerical modeling of step-by-step underground station construction is conducted. The results of the numerical analysis allow to predict the magnitude of surface settlement and understand the wide of settlement trough.
Область исследования:
(Archived) Mining geomechanics
Keywords:
metro
pylon station
foundation
finite element method
surface settlemen
deformation
displacement
Funding:
None
Similar articles
Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potjuchliaev, G. I. Khudiakov
Development of geomechanical provision room-and-pillar system of rock burst ore deposits at great depths
2013 D. V. Sidorov
System of ecological monitoring of atmospheric air of mining industrial aglomeration
2013 M. A. Pashkevich, Y. D. Smirnov, T. A. Petrova