System of ecological monitoring of atmospheric air of mining industrial aglomeration
2013 M. A. Pashkevich, Yu. D. Smirnov, T. A. Petrova
Metrological control administered surveying work
2013 V. A. Golovanov
Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potyukhlyaev, G. I. Khudyakov
Assessment of stress-strain conditions around single development with nonlinear rock-mass deformation
2013 A. G. Protosenya, V. I. Semenov
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Determining of the parameters of water conducting fracture zone through values of underminen strata horizontal deformations values
2013 V. N. Gusev, D. A. Ilyukhin, A. G. Aleksenko